OMIS 352 FINAL EXAM ACTUAL QUESTIONS AND ANSWERS 2024- 2025 SOLVED 100% _____ address where the project stands in terms of meeting scope, time, and cost goals a.Status reports b.Lessons-learned reports c.Technical reports d.Progress reports Ans- A. Status Reports Analogous estimates are also known as _____ estimates. a. parametric b. bottom-up c. top-down d. budgetary Ans- C. Top Down Which of the following is true about identifying stakeholder? a.It is not very difficult to identify stakeholders. b.Stakeholders do not change during a project c.Stakeholders with indirect ties to the project need not be engaged with

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

HOSMERIT



OMIS 352 FINAL EXAM ACTUAL
QUESTIONS AND ANSWERS 2024-
2025 SOLVED 100%


_____ address where the project stands in terms of meeting scope, time, and cost goals


a.Status reports
b.Lessons-learned reports
c.Technical reports

d.Progress reports Ans✔✔- A. Status Reports


Analogous estimates are also known as _____ estimates.


a. parametric
b. bottom-up
c. top-down

d. budgetary Ans✔✔- C. Top Down


Which of the following is true about identifying stakeholder?


a.It is not very difficult to identify stakeholders.
b.Stakeholders do not change during a project
c.Stakeholders with indirect ties to the project need not be engaged with.

,d.The project manager's family is not a potential stakeholder. Ans ✔✔- C. Stakeholders with
indirect ties to the project need not be engaged with


_____ generates ideas for quality improvements by comparing specific project practices or
product characteristics to those of other projects or products within or outside the performing
organization.


a. Benchmarking
b. Mind mapping
c. Prototyping

d. Systems thinking Ans✔✔- A. Benchmarking


In the _____ phase, the project team creates a definitive or very accurate cost estimate, delivers
the required work, and provides performance reports to stakeholders.


a.concept
b.close-out
c.implementation

d.development Ans✔✔- C. Implementation


Which of the following is one of Deming's 14 Points for Management?


a. Eliminate the annual rating or merit system.
b. Award business based on price tag alone rather than on other considerations.
c. An organization should increase dependence on inspection to achieve quality.

d. Minimize total cost by working with multiple suppliers rather than a single supplier. Ans ✔✔-
A. Eliminate the annual rating or merit system


In Rizzati Corp, vice presidents in departments such as engineering, manufacturing, IT, and
human resources report directly to the chief executive officer and undertake their tasks
independently of each other. The staffs of these departments have specialized skills in their
respective disciplines. Rizatti Corp can be said to have a _____ organizational structure.

,a.functional
b.symbolic
c.matrix

d.project Ans✔✔- A. Functional


Which of the following refers to a set of principles that guides decision making based on
personal values of what is considered right and wrong?


a.Ethics
b.Politics
c.Civics

d.Laws Ans✔✔- A. Ethics


_____ provide(s) a standard format for displaying project schedule information by listing project
activities and their corresponding start and finish dates in a calendar format


a.Gantt charts
b.PERT analysis
c.Arrow diagramming method

d.Critical path analysis Ans✔✔- A. Gantt charts


Which of the following is true of projects?


a.They have a unique purpose.
b.They are permanent in nature.
c.They have an indefinite beginning and end.

d.They are developed using regressive elaboration. Ans✔✔- A. They have a unique purpose


Important tools used in the _____ phase of the DMAIC process include a project charter, a
description of customer requirements, process maps, and Voice of the Customer (VOC) data.

, a. define
b. improve
c. analyze

d. measure Ans✔✔- A. Define


_____ uses highly organized and intensive workshops to bring together project stakeholders—
the sponsor, users, business analysts, programmers, and so on—to jointly define and design
information systems.


a.Use case modeling
b.Prototyping
c.JAD

d.RAD Ans✔✔- C. JAD


The first step in project procurement management is:


a.planning procurement management.
b.closing procurement management.
c.conducting procurements.

d.controlling procurements. Ans✔✔- A. Planning procurement management


_____ is a cost that relates to all errors not detected and not corrected before delivery to the
customer.


a.Appraisal cost
b.Prevention cost
c.Internal failure cost

d.External failure cost Ans✔✔- D. External failure cost

Geschreven voor

Vak

Documentinformatie

Geüpload op
4 oktober 2024
Aantal pagina's
36
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Hosmerit Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
347
Lid sinds
2 jaar
Aantal volgers
45
Documenten
4139
Laatst verkocht
4 dagen geleden
HOSMERIT

Welcome to Hosmerit – Your Trusted Source for High-Quality Study Materials Struggling to find reliable and up-to-date resources to help you ace your exams? Look no further. My store offers a wide range of thoroughly researched and well-organized exam guides, test banks, and past papers for various courses and subjects. ✅ Accurate & Up-to-Date – All materials are regularly reviewed to ensure they reflect the most current curriculum. ✅ High-Scoring Content – Get access to study materials that have helped hundreds of students achieve top grades. ✅ Instant Download – Purchase and access your files immediately — no waiting. ✅ Trusted by Students Worldwide – Join a growing number of students who rely on my resources to stay ahead. Whether you're prepping for midterms, finals, or just want to reinforce your understanding, this store is here to help you succeed with confidence.

Lees meer Lees minder
4.8

247 beoordelingen

5
220
4
11
3
6
2
4
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen