/.T/F feasibility estimate is cost model and establishes budget for project - Answer-F
/.T/F key element of quality assurance is keeping communication lines open between
owner and DB - Answer-T
/.T/F in Design/cost relationship of DB, the constructor establishes design parameters
for architect - Answer-T
/.T/F trust is most important thing for DB - Answer-F
/.DB estimating sequence where 15%-20% of design is completed - Answer-Schematic
estimating
/.Trend logs - Answer-Provides baseline budgets and schedules and list estimate trends
/.When is Design considered committed - Answer-Drawings and specs are approved by
DOR and confirmed within budget
/.What is NOT a design managers role - Answer-Coordinating owner design reviews
and approvals
/.Who is responsible for quality assirance - Answer-DB team is responsible for quality
and Entity represents owner in assuring quality
/.Direct DB - Answer-When programming and design is developed by DB entity
/.Spearin Doctrine - Answer-Establishes that under DBB, owner is responsible for
increased cost due to defective plans/specs
/.Adjusted low bid - Answer-Selection where qualitative aspects are scored out of 100
the divided by qualitative score
/.Design criteria DB - Answer-Owner defines performance data but DB Entity provides
design solution
/.Weighted criteria - Answer-Awarded to proposer with highest combined total points of
technical and price proposals
/.Conceptual estimating - Answer-Estimate provided with very little design