payment and performance bonds on all public works.
/.Qualifications Based Brooks Act 1972 - A/E's selected on qualifications
/.Clinger Cohen Act 1996 Defense Procurement Reform Act - Allows all federal
agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build.
/.Standard of Care - The level of quality that any average Design Professional would be
able to perform given the circumstances.
/.Design Bid Build - Slowest Project Delivery method, linear in nature, prescriptive
(owner knows what they want),
/.Multi Prime - Project Delivery
/.CM at Risk - Project Delivery method allowing the contractor to come on board very
early in design for preconstruction services yet maintains separation between Designer
and Builder contractually.
/.Design Build - Fastest Project Delivery method, fast tracking possible overlapping
design with construction utilizing incremental packages.
/.Low Bid - Procurement Method
/.Negotiated (Qualifications Based) - Procurement Method
/.Best Value - Procurement Method
/.Sole Source - Procurement Method
/.Lump Sum - Contract Format typically in DBB
/.Cost Plus Fee - Contract Format
/.GMP (Guaranteed Maximum Price) - Contract Format
/.Unit Price - Contract Format
/.Target Price - Contract Format