NCCCO Lattice Boom General Knowledge Exam Questions With Correct Answers .A long boom crane working at minimum radius and 3 degrees out of level will have a loss of capacity by; - ANSWER-50% .According to ASME B30.5 a fire extinguisher shall have a rating of __________ and shall be available at all operator's stations or cabs of the equipment. - ANSWER-10 BC or higher .According to ASME B30.5 Mobile Crane Standard, in rotation resistant rope, how many randomly distributed broken wires is caused for consideration for replacement of the rope? - ANSWER-Two broken wires in six rope diameters .According to B30.10 hooks shall be removed from service when the throat opening exceeds _____ the original throat opening. - ANSWER-5% .According to OSHA 1926.1412, how often should all running ropes in service be visually inspected ___________ and in accordance with ____________. - ANSWER-Each shift, 1926.1413(a) .According to OSHA, Jibs must have a positive ________ from backwards overturning - ANSWER-Stop .Backward stability of a crane is tested with the crane configured; - ANSWER-Basic boom at maximum angle with no load .Block hoisting sheaves should have a minimum pitch diameter of at least________ the rope diameter. - ANSWER-16 times .Boom hoisting sheaves shall have pitch diameter of not less than ____ the nominal diameter of the rope used. - ANSWER-15 times .Boom length is defined as? - ANSWER-Center of the boom attachment pin (heel pin, foot pin, pivot pin), to the center of the boom tip sheaves

Show more Read less
Institution
Course

Content preview

NCCCO Lattice Boom General Knowledge
Exam Questions With Correct Answers
.A long boom crane working at minimum radius and 3 degrees out of level will have a loss of capacity by;
- ANSWER-50%



.According to ASME B30.5 a fire extinguisher shall have a rating of __________ and shall be available at
all operator's stations or cabs of the equipment. - ANSWER-10 BC or higher



.According to ASME B30.5 Mobile Crane Standard, in rotation resistant rope, how many randomly
distributed broken wires is caused for consideration for replacement of the rope? - ANSWER-Two
broken wires in six rope diameters



.According to B30.10 hooks shall be removed from service when the throat opening exceeds _____ the
original throat opening. - ANSWER-5%



.According to OSHA 1926.1412, how often should all running ropes in service be visually inspected
___________ and in accordance with ____________. - ANSWER-Each shift, 1926.1413(a)



.According to OSHA, Jibs must have a positive ________ from backwards overturning - ANSWER-Stop



.Backward stability of a crane is tested with the crane configured; - ANSWER-Basic boom at maximum
angle with no load



.Block hoisting sheaves should have a minimum pitch diameter of at least________ the rope diameter. -
ANSWER-16 times



.Boom hoisting sheaves shall have pitch diameter of not less than ____ the nominal diameter of the
rope used. - ANSWER-15 times



.Boom length is defined as? - ANSWER-Center of the boom attachment pin (heel pin, foot pin, pivot pin),
to the center of the boom tip sheaves

, .Can rotation resistant rope be used with a swivel? - ANSWER-If approved by the rope's manufacture



.D to d ratio means what? - ANSWER-Sheave diameter or Pitch diameter divided by wire rope diameter



.During disassembly of a long boom, the pendant lines are connected at the maximum cantilever point
and the boom is slightly lifted off the ground, which boom connection pins are to be removed next? -
ANSWER-The bottom pins ahead of the cantilever point



.How far can a freely suspended lattice boom be erected beyond the pendant connections? - ANSWER-
Varies by manufacture



.How many broken wires must be present in one strand of one lay for running wire rope to be removed
from service? - ANSWER-3



.How many randomly broken wires must there be to remove a running wire rope from service? -
ANSWER-6



.How many randomly distributed broken wires are caused for considering replacement of a standard
running rope? - ANSWER-Three broken wires in in one strand in one lay



.If the manufacture of a particular crane does not specifically permit pick and carry operations what
procedure must be followed during this operation? - ANSWER-Don't make any pick and carry lifts



.If you move a crawler crane from soft ground to hard ground, ground bearing pressure will; - ANSWER-
Increase



.Lattice boom cranes manufactured after 11-8-2011 must have which safety device installed - ANSWER-
Anti-two block prevention device



.Lattice boom cranes manufactured after 2-28-92 must have which safety device installed? - ANSWER-
Anti-two block warning device

Written for

Course

Document information

Uploaded on
October 9, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$7.69
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamCore Harvard University
Follow You need to be logged in order to follow users or courses
Sold
29
Member since
2 year
Number of followers
11
Documents
1656
Last sold
1 month ago
TOP SELLER CENTER

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that\'s why i\'m one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Read more Read less
3.5

6 reviews

5
2
4
2
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions