FDNY s12
During an operational test of a foam water sprinkler system, if the nozzles are clogged what
color tag is used?
Red
Steel water storage tanks without corrosive protection are to be inspected how often?
3 Years
Previous
Play
Next
Rewind 10 seconds
Move forward 10 seconds
Unmute
0:00
/
0:15
Full screen
Brainpower
Read More
A sprinkler head with a white frame has a temperature rating of?
175 - 225°F
The weekly test of a Diesel fire pump is how long?
30 minutes
The weekly test of an electric fire pump is how long?
10 minutes
Upon inspection of a sprinkler system, if the hydraulic nameplate is missing what color tag is
used?
Yellow
,When inspecting a preaction system, if the electrical components are not in service what color
tag is used?
Red
Vane type water flow devices shall be tested how often?
Semi-annually
Proper number of spare heads and wrenches shall be inspected how often?
Annually
The temperature rating of a sprinkler head with a green glass bulb is?
175 - 225°F
When inspecting a sprinkler system if the spare sprinkler cabinet is missing what color tag
should be used?
Yellow
On a dry pipe sprinkler head if no tests were conducted in 12 years what color tag should be
used?
Orange
Red Tag
Impairment (Notify FDNY, shall be fixed immediately)
Orange Tag
Critical Deficiency (Notify FDNY if not fixed after 30 days)
Yellow Tag
Non-critical Deficiency (Notify FNDY if not fixed after 30 days)
Green Tag
System fully operational without defects
How often shall the stem of an OS&Y Valve be lubricated
,Annually
The 3 year dry pipe trip test is to be performed by whom?
MP & MF SPC
Fire department connections are to be inspected how often?
Quarterly
Water motor gongs are to be tested how often?
Quarterly
In a water spray fixed system inspection if the strainer is found corroded what color tag is
required?
Yellow
A sprinkler head with a red frame has a temperature classification of?
Extra High (325 - 375°F)
The Hydraulic nameplate shall be inspected how often?
Quarterly
What color tag is required when sprinkler heads are found to be lightly corroded?
Orange
Obstructions in sprinkler systems shall be investigated how often?
5 Years
What color tag is required when the circuit breakers on a special service pump are over 2 years
old?
Orange
What color tag is required when sprinkler heads made prior to 1920 have not been replaced?
Orange, notify FDNY after 30 days
, Orange/Red bulb temperature
135 - 170°F
Yellow or Green Bulb temperature
175 - 225°F
Blue Bulb temperature
250 - 300°F
Purple Bulb temperature
325 - 375°F
Black Bulb with Green Frame temperature
400 - 475°F
Black Bulb with Orange Frame Temperature
500 - 650°F
The temperature for water tanks shall not be less than
40°F (4°C)
Tanks without supervised water level alarms shall be inspected
Monthly
Tanks with supervised water level alarms shall be inspected
Quarterly
Records of all system inspections, tests, servicing, and maintenance shall be kept on premises
for
A minimum of 3 years
The building owner shall assign an ___________ to comply with city requirements
Impairment Coordinator
During an operational test of a foam water sprinkler system, if the nozzles are clogged what
color tag is used?
Red
Steel water storage tanks without corrosive protection are to be inspected how often?
3 Years
Previous
Play
Next
Rewind 10 seconds
Move forward 10 seconds
Unmute
0:00
/
0:15
Full screen
Brainpower
Read More
A sprinkler head with a white frame has a temperature rating of?
175 - 225°F
The weekly test of a Diesel fire pump is how long?
30 minutes
The weekly test of an electric fire pump is how long?
10 minutes
Upon inspection of a sprinkler system, if the hydraulic nameplate is missing what color tag is
used?
Yellow
,When inspecting a preaction system, if the electrical components are not in service what color
tag is used?
Red
Vane type water flow devices shall be tested how often?
Semi-annually
Proper number of spare heads and wrenches shall be inspected how often?
Annually
The temperature rating of a sprinkler head with a green glass bulb is?
175 - 225°F
When inspecting a sprinkler system if the spare sprinkler cabinet is missing what color tag
should be used?
Yellow
On a dry pipe sprinkler head if no tests were conducted in 12 years what color tag should be
used?
Orange
Red Tag
Impairment (Notify FDNY, shall be fixed immediately)
Orange Tag
Critical Deficiency (Notify FDNY if not fixed after 30 days)
Yellow Tag
Non-critical Deficiency (Notify FNDY if not fixed after 30 days)
Green Tag
System fully operational without defects
How often shall the stem of an OS&Y Valve be lubricated
,Annually
The 3 year dry pipe trip test is to be performed by whom?
MP & MF SPC
Fire department connections are to be inspected how often?
Quarterly
Water motor gongs are to be tested how often?
Quarterly
In a water spray fixed system inspection if the strainer is found corroded what color tag is
required?
Yellow
A sprinkler head with a red frame has a temperature classification of?
Extra High (325 - 375°F)
The Hydraulic nameplate shall be inspected how often?
Quarterly
What color tag is required when sprinkler heads are found to be lightly corroded?
Orange
Obstructions in sprinkler systems shall be investigated how often?
5 Years
What color tag is required when the circuit breakers on a special service pump are over 2 years
old?
Orange
What color tag is required when sprinkler heads made prior to 1920 have not been replaced?
Orange, notify FDNY after 30 days
, Orange/Red bulb temperature
135 - 170°F
Yellow or Green Bulb temperature
175 - 225°F
Blue Bulb temperature
250 - 300°F
Purple Bulb temperature
325 - 375°F
Black Bulb with Green Frame temperature
400 - 475°F
Black Bulb with Orange Frame Temperature
500 - 650°F
The temperature for water tanks shall not be less than
40°F (4°C)
Tanks without supervised water level alarms shall be inspected
Monthly
Tanks with supervised water level alarms shall be inspected
Quarterly
Records of all system inspections, tests, servicing, and maintenance shall be kept on premises
for
A minimum of 3 years
The building owner shall assign an ___________ to comply with city requirements
Impairment Coordinator