Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

FDNY COLLAPSE EXAM QUESTIONS AND ANSWERS 2024/2025( A+ GRADED 100% VERIFIED).

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
09-10-2024
Geschreven in
2024/2025

FDNY COLLAPSE EXAM QUESTIONS AND ANSWERS 2024/2025( A+ GRADED 100% VERIFIED).

Instelling
FDNY COLLAPSE
Vak
FDNY COLLAPSE

Voorbeeld van de inhoud

FDNY COLLAPSE
True or False --- structural collapse is a single command event and the FDNY has been
designated as the IC? - ANS True

Clean wood at beam ends is an indicator that roofs or walls are pulling away from walls and
signs of a possible collapse---true or false - ANS True

Collapse--who. Has prime responsibility for rescue activities at the incident site and assumes
the role of incident commander for structural collapse that produce casualties or threaten public
safety? - ANS The FDNY fire officer

What should be special called to every major collapse if none is assigned on the initial alarm? -
ANS Tower ladder

What is the single most important consideration in a collapse? - ANS Safety at the scene

At all explosions and major collapses, SOC units shall ensure the immediate area is monitored
for what? - ANS The presence of radiological/chemical agents

Collapse---explosions should be viewed as possible. __________sites until monitoring shows
the area to be clear of contamination - ANS Dirty bombs

What needs to be carefully evaluated before attempting complicated rescues? - ANS The
safety of personnel

If possible both the1st and 2nd arriving engines should take hydrants where? - ANS Separate
hydrants outside the block, each on separate mains...

Where should the 3rd and 4th engine position themselves? - ANS Also in separate hydrants in
the rear of the structure

How should 2 of the 2nd alarm engine companies position themselves? - ANS They should be
used to seal off the block

Initially what should be the only unit in front of the building? - ANS The first arriving tower
ladder

True or false---the staging area manager can be a company officer? - ANS True--until replaced
by a chief

, First alarm engine company duties from highest priority to least priority? - ANS 1. Extinguish fire
in affected building and surrounding debris
2. Protect exposures
3. Extinguish burning vehicles
4. Stretch and charge 2 1/2 precautionary line and also a 3 1/2 line to tower ladder
5. Terrorist event 2 1/2 line should be between tower ladder to protect personnel

What is the 1st engine responsible for? - ANS Officer supervises water supply activities/app.
placement
The officer must ensure stretching of 2 1/2 line to cover the entire building
consider stretching 3 1/2 line to supply TL

What is the 2nd arriving engine company responsible for? - ANS Ensuring a 3 1/2 line is
stretched to the first TL
If necessary members may perform CFRD duties

What are the responsibilities of 3rd and subsequent arriving engine companies? - ANS Fire
control
stretch additional lines
Perform cfrd duties
assist in removal of lightly buried victims

What does the first ladder company do? - ANS Perform scene survey
hazard assessment and control
remove surface victims
perform visual void search...DO NOT cut,lift or remove load bearing members

What should the 2nd arriving ladder company do? - ANS Immediately begin the process of
controlling the gas, electric and water services

Third and subsequent ladder companies at a collapse are responsible for? - ANS Search line of
sight voids, assist with utilities, perform debris removal, cut timbers, assist with victim removal

If collapse conditions are present requiring an extensive rescue and search...what signal must
be transmitted? - ANS 10-60

Who is assigned as the street coordination manager? - ANS A company officer

Collapse--What does the acronym LCES stand for: - ANS Lookouts, Communications, Escape
routes, Safe havens

Collapse---what should lookouts be equipped with? - ANS Air Horns, HT's

What does 1 long horn blast mean? - ANS Cease Operations/All quiet

Geschreven voor

Instelling
FDNY COLLAPSE
Vak
FDNY COLLAPSE

Documentinformatie

Geüpload op
9 oktober 2024
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
LECTVICTOR

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
LECTVICTOR Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
1 jaar
Aantal volgers
2
Documenten
1267
Laatst verkocht
6 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen