Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|AGRAD

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
11-10-2024
Geschreven in
2024/2025

CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|AGRAD

Instelling
Vak

Voorbeeld van de inhoud

CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM
ACTUAL EXAM QUESTIONS AND CORRECT DETAILED
ANSWERS WITH RATIONALES|AGRAD
Type A Fire Extinguisher - ANSWER: Puts out paper, wood, cloth, rubbish fires.

Type B Fire Extinguisher - ANSWER: Puts out flammable and combustible liquids.

Type C Fire Extinguisher - ANSWER: Puts out electrical fires.

According to CCR, Title 23 UST Regulations, what is the frequency that the monitor
system certification must be performed? - ANSWER: 12 month

If visual monitoring is utilized as the means of release detection for a single walled
tank, it must be conducted on a _____ basis. - ANSWER: daily

The purpose of spill and overfill protection equipment is to minimize the potential
for a release during _____. - ANSWER: fuel deliveries

Which of the following is a potential symptom of toxic petroleum exposure?

a. dizziness
b. tremors
c. eye irritation
d. all the above - ANSWER: d. all the above

Under-dispenser containment is required for _____ underground storage tank
systems. - ANSWER: all

All of the following are true for Automatic Tank Gauging except for...

a. ATG system consists of a probe installed in a tank
b. ATG systems are required to be installed in all UST systems
c. ATG systems have a control panel that can provide information on product level
and temperature
d. ATG systems can be programmed to calculate the changes in product volume to
determine if a tank is leaking - ANSWER: b. ATG systems are required to be installed
in all UST systems

According to CCR Title 23, UST regulations, spill containment must meet all of the
following requirements except:

a. be installed on vent risers
b. have a minimum capacity of 5 gallons
c. collect any hazardous substance

, d. be equipped with a a drain valve or other means to keep the spill container empty
- ANSWER: a. be installed on vent risers

Suction piping may not require leak detection if it has only one check valve located
where? - ANSWER: directly below the suction pump

Service technician performing work on monitoring equipment must be trained by
_____. - ANSWER: the manufacturer of the equipment

Air monitoring must be conducted _____ performing work within a confined space. -
ANSWER: Prior to and during.

A UST service technician must be recertified by the equipment manufacturer at the
time interval recommended by the equipment manufacturer or at least every _____
months. Which ever is greater. - ANSWER: 36 months

When an automatic tank gauge is utilized for singel-walled tank leak detection, it
shall test the tank at least monthly after product delivery or when the tank is filled to
within _____ percent of the highest operating level during the previous month. -
ANSWER: 10

The following is true of spill buckets except...

a. must provide drainage for spilled product into secondary containment sump
b. must be tested anually
c. designed to catch product spilled during disconnection for delivery hose
d. for temporary storage only - ANSWER: a. must provide drainage for spilled
product into secondary containment sump

If during an inspection of dispensing equipment at a retail gas station you find that
the product is dispensing at a significant lower rate than usual. You should check
_____. - ANSWER: for piping leaks

According to CCR title 23 UST regulations the local agency must be notified by the
owner/operator how long before conducting secondary containment testing? -
ANSWER: At least 48 hours before the test.

Poppet valves are a vapor recovery component installed: - ANSWER: on the vapor
recovery riser

If equipped with an ATG it shall be programmed to test the tank _____? - ANSWER:
at least monthly

A vacuum-assist nozzle is a component of a(n) _____? - ANSWER: Stage II vapor
recovery system

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
11 oktober 2024
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
morrismuriithi009
3.0
(1)

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
morrismuriithi009 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
1 jaar
Aantal volgers
0
Documenten
760
Laatst verkocht
6 maanden geleden

3.0

1 beoordelingen

5
0
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen