Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CDFM MODULE 4 EXAM

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
11-10-2024
Written in
2024/2025

Exam study book Evolutionary Acquisition of Mark A. Lorell, Julia Lowell, Obaid Younossi - ISBN: 9780833038821 (CDFM MODULE 4 EXAM)

Institution
Course

Content preview

CDFM MODULE 4 EXAM REAL EXAM 210 QUESTIONS AND
CORRECT ANSWERS(DETAILED ANSWERS)
What is JCIDS (Joint Capabilities Integration and Development System)? - ANSWER:
assesses gaps in military joint warfighting capabilities and recommends solutions to
resolve these gaps

Defense Acquisition System - ANSWER: Process by which DoD acquires weapon
systems and automated information systems

What document provides entry into Milestone A the the Defense Acquisition
System? - ANSWER: Materiel Development Decision

What are the two steps in pre-systems acquisition? - ANSWER: Materiel solution
analysis and technology development

Which milestone is the program initiation? - ANSWER: Milestone B

The MDA may authorize entry into the acquistion system at any point? True or False
- ANSWER: True

What are the most expensive programs? - ANSWER: ACAT IA

Who is the single point of accountability for accomplishing program objectives? -
ANSWER: program manager

What says the DOD may not obligate funds for a major defense acquisition program
after the program enters the Engineering and Manufacting phase? - ANSWER: 10
USC 2435

What is systems engineering? - ANSWER: overarching process that a program team
applies to transition from a stated capability need to an operationally suitable
system. It is the integrating mechanism across the technical efforts

Program managers prepare a _________ for each milestone review, beginning with
Milestone A. - ANSWER: Systems Engineering Plan (SEP)

Integrated Product and Process Development (IPPD) is - ANSWER: mgmt technique
that simultaneously integrates all essential acquisition activities through the use of
multidisciplinary teams to optimize design, manufacturing and supportability
processes.

What are the 3 levels of IPT's - ANSWER: Overachring Integrated Product Team
(OIPT) that oversees entire program, Integrateing Integrated Product Team (IIPT),
and Working Level Integrated Product Team (WIPT) that advise the PM

, What are the 8 technical management processes? - ANSWER: 1. Decision Analysis 2.
Technical Planning 3. Technical Assessment 4. Requirements Management 5. Risk
Management 6. Configuration Management 7. Data Management 8. Interface
Management

What is decision analysis? - ANSWER: provide the basis for evaluating and selecting
alternatives

SEP is a mandated tool for this activity - ANSWER: Technical planning

_______ measures technical progress and the effectiveness of plans and
requirements - ANSWER: technical assessment

What maintains the traceability of all requirements from needs? - ANSWER:
requirements management

_________ is an audit trail of decisions and design modifications - ANSWER:
configuration management

What answers the question of "did you build it right"? - ANSWER: verification

What answers "is this the right solution"? - ANSWER: validation

What is a system of system engineering? - ANSWER: satisfy capabilities thru multiple
and interacting systems. Not to be confused with a "family of systems"

What is the formal entry point into the acquisition process? - ANSWER: Material
Solution Analysis Phase

What is not a decision point but opens the gate if all criteria has been met? -
ANSWER: MDA

Which pases enters approved ICD and study guidance for conducting AOA and is
guided by ICD and AOA plan? - ANSWER: materiel solution analysis phase

Which phase reduces technology risks, determine and mature the appropriate set of
technologies to be integrated into a full system and to demonstrate critical
technologies on prototypes? - ANSWER: technology development phase

The MDA for an MDAP, without the authority to delegate, shall sign a certification
memorandum for record prio to ______________? - ANSWER: Milestone A

What follows the completion of technology development? - ANSWER: Milestone B
decision

Connected book

Written for

Course

Document information

Uploaded on
October 11, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$18.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
morrismuriithi009
3.0
(1)

Also available in package deal

Get to know the seller

Seller avatar
morrismuriithi009 Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
1 year
Number of followers
0
Documents
760
Last sold
5 months ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions