U3 ICC TANK TIGHTNESS TESTING WY EXAM NEWEST
2024 WITH COMPLETE QUESTIONS AND CORRECT
VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY
GRADED A+ 100% GUARANTEED TO PASS
CONCEPTS!!!
_______________ cathodic protection systems can influence other nearby metallic structures that are
not part of the protected system.
Impressed-current
___________________ and fittings are used to separate buried piping from above ground piping and
tanks from piping.
Dielectric bushings
Changes in temperature cause _________ in the product and in tank dimensions
expansion or contraction
The rate of temperature change in the first day or two after addition of liquid is ________ degrees
Fahrenheit per hour
0.02 to 0.25
,Gasoline has an expansion coefficient of ________ gallons per degree Fahrenheit
0.00068
A change of __________ degrees Fahrenheit per hour in a 10,000 gallon tank may cause a 0.068 gallon
change in the product volume per hour.
0.01
Water may enhance _________
a. corrosion
b. hazard
c. sheen
a. corrosion
Increasing volume due to temperature increase may ________ a leak
a. mask
b. mimic
c. indicate
a. mask
Decreasing volume due to temperature decrease may falsely ________ a leak
,a. mask
b. mimic
c. indicate
c. indicate
Any owner who brings a UST into use after _________ must within _____ of bringing tank into use
submit notice of existence to state or local agency.
a. November 11, 1994, 60
b. October 18, 2001, 90
c. May 8, 1986, 30 days
c. May 8, 1986, 30 days
Cathodic Protection testing is required every ________
a. 3 years
b. 1 year
c. 60 days
a. 3 years
If fuel was spilled during testing, maintenance or repair activities, which of the following would be an
inappropriate response__
a. immediately locate facility spill kit
, b. report any spill or discharge to the AHJ.
c. Immediately remove people from the area
d. Clean the spill and store the cleaning materials inside the facility for later disposal.
d. Clean the spill and store the cleaning materials inside the facility for later disposal.
UST syustems with impressed current cathodic protection systems must also be inspected every _____
to ensure equipment is running properly.
a. 30 days
b. 90 days
c. 60 days
d. 3 years
c. 60 days
Within _______ following a repair of any CP protected system, it must be tested to ensure it is operating
correctly.
a. 6 months
b. 24 hours
c. 30 days
a. 6 months
2024 WITH COMPLETE QUESTIONS AND CORRECT
VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY
GRADED A+ 100% GUARANTEED TO PASS
CONCEPTS!!!
_______________ cathodic protection systems can influence other nearby metallic structures that are
not part of the protected system.
Impressed-current
___________________ and fittings are used to separate buried piping from above ground piping and
tanks from piping.
Dielectric bushings
Changes in temperature cause _________ in the product and in tank dimensions
expansion or contraction
The rate of temperature change in the first day or two after addition of liquid is ________ degrees
Fahrenheit per hour
0.02 to 0.25
,Gasoline has an expansion coefficient of ________ gallons per degree Fahrenheit
0.00068
A change of __________ degrees Fahrenheit per hour in a 10,000 gallon tank may cause a 0.068 gallon
change in the product volume per hour.
0.01
Water may enhance _________
a. corrosion
b. hazard
c. sheen
a. corrosion
Increasing volume due to temperature increase may ________ a leak
a. mask
b. mimic
c. indicate
a. mask
Decreasing volume due to temperature decrease may falsely ________ a leak
,a. mask
b. mimic
c. indicate
c. indicate
Any owner who brings a UST into use after _________ must within _____ of bringing tank into use
submit notice of existence to state or local agency.
a. November 11, 1994, 60
b. October 18, 2001, 90
c. May 8, 1986, 30 days
c. May 8, 1986, 30 days
Cathodic Protection testing is required every ________
a. 3 years
b. 1 year
c. 60 days
a. 3 years
If fuel was spilled during testing, maintenance or repair activities, which of the following would be an
inappropriate response__
a. immediately locate facility spill kit
, b. report any spill or discharge to the AHJ.
c. Immediately remove people from the area
d. Clean the spill and store the cleaning materials inside the facility for later disposal.
d. Clean the spill and store the cleaning materials inside the facility for later disposal.
UST syustems with impressed current cathodic protection systems must also be inspected every _____
to ensure equipment is running properly.
a. 30 days
b. 90 days
c. 60 days
d. 3 years
c. 60 days
Within _______ following a repair of any CP protected system, it must be tested to ensure it is operating
correctly.
a. 6 months
b. 24 hours
c. 30 days
a. 6 months