Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

AVIXA CTS-I Study Questions and Correct Answers

Rating
-
Sold
-
Pages
25
Grade
A+
Uploaded on
15-10-2024
Written in
2024/2025

1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site survey for an installation with a display, information gathered should include: A. Color of the walls B. Receptionist name and phone number C. Ceiling height and construction method D. Rules governing use of the freight elevator C. Ceiling height and construction method [Conducting Site Rough-In/ First-Fix/Mount Substructure] When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able to support a minimum weight of: A. 82kg (1801b) B. 41kg (90lb) C. 204kg (450lb) D. 122kg (270lb) C. 204kg (450lb) 3. [Installing Audiovisual Systems/Prepare Audiovisual Rack] Where should you place the wireless microphone receiver antenna in a rack assembly? A. Line of sight to the transmitter B. Inside the transmitter room C. In the front of the rack D. At the rear of the rack C. In the front of the rack 4. [Performing Systems Closeout/Provide Training on Equipment Operation] When training a customer on the operation of a touch-panel interface, an example that the GUI is a good design that meets the customer's needs is: A. The customer can easily use the touch panel with little explanation B. The customer requires intensive training on how to use the touch panel C. The customer thinks the panel looks cool D. The customer wants only a few changes A. The customer can easily use the touch panel with little explanation 1. Before developing a project plan, it is important to: A. Make sure the client has made a deposit payment B. Have a clear understanding of the scope of work C. Order the AV equipment needed D. List all the teams that will work on the project B. Have a clear understanding of the scope of work 2. A scope statement should include: A. Only the items within the project scope B. Only the items within the deliverable scope C. All the tasks that have to be performed D. Both in-scope and out-of-scope items D. Both in-scope and out-of-scope items 3. The key elements of a project should be driven by: A. The cost of materials B. The overall budget C. The client's need D. The deadline for completion C. The client's need 4. What is a dependency within a project task schedule? A. A task that cannot begin before another task has been completed B. A task that must be completed by a specific date C. A task that will be required if specific conditions occur at the project site D. An optional task that the client can determine is needed once the project is underway A. A task that cannot begin before another task has been completed 5. Project budget refers to which of the following? A. The amount of labor and materials the project manager has allocated to complete the project B. The total amount that the client has paid the AV company for the project C. The amount needed for purchasing the materials and supplies D. The actual cost of labor and materials used to complete the project A. The amount of labor and materials the project manager has allocated to complete the project 6. A primary reason for attending construction meetings is to: A. Develop a relationship with the other people on the job B. Identify changes to the original design that will affect the AV installation C. Find out the project's completion date D. Submit invoices and other budget documentation B. Identify changes to the original design that will affect the AV installation 7. In the event of a change in the placement of air-conditioning ducts in a boardroom, which of the following documents should the AV integrator submit first? A. Punch/snag/problem list B. Change order (CO) C. Request for change (RFC) D. Request for information (RFI) D. Request for information (RFI) 8. Which of the following documents should an AV integrator submit in the event that a manufacturer has discontinued a projector model? A. Letter of transmittal B. Progress report (PR) C. Request for change (RFC) D. Construction change directive (CCD) C. Request for change (RFC) 9. The ANSI/AVIXA 2M-2010 Standard Guide for Audiovisual Systems Design Coordination Processes lays out a procedure for determining the _ A. functions and features that are required to support a given set of tasks B. project communication that needs to take place on a given project C. room types that are suitable for a given set of client needs D. verification tests that should be performed during a given project B. project communication that needs to take place on a given project

Show more Read less
Institution
CTS-I
Course
CTS-I










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CTS-I
Course
CTS-I

Document information

Uploaded on
October 15, 2024
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
twishfrancis Kaplan University
Follow You need to be logged in order to follow users or courses
Sold
221
Member since
2 year
Number of followers
43
Documents
10603
Last sold
2 weeks ago
SmartStudy Hub

Discover top-quality study materials at SmartStudy Hub. From concise summaries to exam guides, I offer resources designed to boost your grades. Trust in my expertise and elevate your academic performance today! NB: I do assignments too. Struggling to meet your academic deadlines? I\'ve got you covered! I\'ll ensure papers are delivered on time, each time. Don\'t let deadlines stress you out- let\'s work together to achieve your academic goals! WELCOME!!!

Read more Read less
4.0

39 reviews

5
22
4
6
3
5
2
0
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions