Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CLMS CERTIFICATION EXAM 2024 ACTUAL EXAM COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS / ALREADY GRADED A+

Beoordeling
4.0
(1)
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
28-10-2024
Geschreven in
2024/2025

CLMS CERTIFICATION EXAM 2024 ACTUAL EXAM COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS / ALREADY GRADED A+

Instelling
Vak

Voorbeeld van de inhoud

CLMS CERTIFICATION EXAM 2024 ACTUAL EXAM
COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS / ALREADY GRADED A+
Why is it important to collaborate with contractors on risk management (RM)? -
ANSWER: Most issues begin with the contractor, so it is essential for the government
to prevent risks (NOT)

Which of the following are typical sources of framing assumptions (FAs)? (Select all
that apply.) - ANSWER: -Technological and engineering challenges
-Interdependencies with other programs
-Cost, schedule, and requirements tradeoffs

During which phase should you be building and maintaining robust stakeholder
relationships and ensuring horizontal and vertical communications? - ANSWER: MSA,
TMRR, EMD

What would be the appropriate corrective action for the following issue: One of the
orders for materials is going to run 75% over budget because the order will have to
be shipped by air to meet schedule requirements. The budgeting team may be able
to find funds from other sources. - ANSWER: Transfer

Which of the following is a responsibility of the Integrated Product Team (IPT) during
the risk management (RM) process? - ANSWER: Coordinate RM efforts for risks
affecting multiple IPTs.

What is the main differences between a risk and an opportunity? - ANSWER: Risks
have a negative consequence, while opportunities requires creating additional tasks.

A Monte Carlo simulation reports a 75% chance that the prototyping tasks
associated with a new Doppler-based wind measuring technology will be delayed 17
business days due to supply shortages of two key pieces of equipment. Based on the
likelihood and consequence table, which of the following represents the appropriate
location on the risk matrix? - ANSWER: L = 4; C = 2

During Technology Maturation and Risk Reduction (TMRR), the goal is to primarily
reduce which types of risk? (Select all that apply.) - ANSWER: -Technology
-Integration
-Engineering

Based on the results of a simulation, there is a 70% chance that the project will end
two weeks behind schedule. Using the table provided, what would the cumulative
schedule risk be, based on a two-week schedule delay? - ANSWER: Probability 4;
Schedule Impact 2

, Which of the following is the difference between a risk and an issue? - ANSWER: A
risk is the potential of occurring; and issue has occurred or is certain to occur.

Which of the following is a critical success factor to ensure effective risk
management (RM)? - ANSWER: -Program Risk Process (PRP) Document

Who may write the Program Risk Process (PRP) Document? - ANSWER: The program
manager (PM) or a dedicated risk manager

The following describes which type of category of risk: Certification for a new
weapons system is scheduled for January. The test is dependent on temperatures
below freezing. If the temperature is too warm, the system cannot be certified. -
ANSWER: Business

Your program is developing a piece of equipment that require a seismograph to
identify and track low ground vibrations within a specific range. You need to
understand how well the design and manufacturing process will be able to meet the
performance goals. Which tool will provide that information? - ANSWER:
Performance risk analysis (PRA)

Your program is planning on visiting a cooperating country to conduct an
information-sharing event with military counterparts. While the government is
strategically allied with U.S. interests, popular opposition to U.S. policies has been
growing in strength and has turned to increasingly violent demonstrations on the
streets. Which risk mitigation technique should you choose for this security risk? -
ANSWER: Avoidance

Within a program, which of the following entities is responsible for ensuring the risk
management (RM) process is executed according to the Program Risk Process (PRP)
Document? - ANSWER: Risk Management Board (RMB)

A shortage of steel has caused a delay in one of the tasks until the material is
available. The original plan estimated the material to be available in 6 weeks, but the
shortage continues. What would be an appropriate step to tracking and managing
this issue? - ANSWER: -Adjust the corrective action plan and issue level as warranted

Monte Carlo simulations use computational algorithms to simulate the behavior of
various systems in a nondeterministic manner. Why are these "nondeterministic"
results important to program schedule analysis? - ANSWER: Because there are one
or more points in the simulation where a choice is made between different paths,
without any specific guidance on which one will be chosen

Which of the following is a good example of a framing assumption (FA)? - ANSWER:
The ballistic missile program will achieve Initial Operational Capability (IOC) in time
to use the systems procured by this program

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
28 oktober 2024
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
1 jaar geleden

4.0

1 beoordelingen

5
0
4
1
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
charitywairimuuu Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
18
Lid sinds
1 jaar
Aantal volgers
2
Documenten
1295
Laatst verkocht
6 maanden geleden
EXCELLENT HOMEWORK HELP AND TUTORING ,

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that\'s why i\'m one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Lees meer Lees minder
4.6

545 beoordelingen

5
409
4
81
3
30
2
18
1
7

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen