When designing a new multi-story government Special Access Program Facility
(SAPF), the architect provided identical drawings for two three-story buildings to
the security officer. One drawing is for a building on the installation to be occupied
only by contracting Company X. The other is for the command headquarters
building on the installation. The design reveals floor-to-ceiling windows on the
second floor for the main conference rooms and front office staff. The drawings
indicate a parking lot adjacent to the building separated by a four-foot-wide,
Page 1 of 15
, handicap-accessible sidewalk. The architect placed emergency exits and stairwells
at each end of the building with door hardware on the exterior to facilitate
access/egress. The floor plans show interior office and conference room doors
with GSA-approved locks and connectivity to the building access control badge
system. The front door drawings indicate a large safety g - Answer: B. It must be in
an area designated as a Restricted Area
True or False. Hinge pins that are located on the exterior side of emergency exit
doors in the SAPF must be spot welded or have set screws installed to prevent
removal of the door. - Answer: True
Which of the following man-made barriers could be an appropriate measure to
impede vehicle passage between the parking lot and the building?
A. Bollard or chain link fence
B. Berm or moat
C. Bollard or berm
D. Berm or chain link fence - Answer: C. Bollard or berm
1. Assess Assets
2. Assess Threats
3. Assess Vulnerabilities