NDSU Project Management Final
Exam Study Set
What are the four phases of the project life cycle, properly listed in sequential order? -
Answer Initiating, Planning, Performing, Closing

Define project - Answer A temporary endeavor undertaken to create a unique product,
service, or result

Projects are selected to be funded during which of phase of the project life cycle? -
Answer Initiating Phase

If something is _______________ the statement of work, then it should be assumed that
_______________. - Answer not included in, it will not be done or provided

The project plan is executed and controlled during which phase of the project life cycle?
- Answer Performing Phase

When making contingency estimates, the contractor should - Answer Estimate the
amount necessary to mitigate high impact and probable issues

The project scope is all the work that must be done to do all of the following except:

A. Producing all the project deliverables

B. Exceeding the expectations listed in the project charter

C. Accomplishing the project objective

D. Satisfying the sponsor or customer that all the work and deliverables meet the
requirements or acceptance criteria - Answer Exceeding the expectations listed in the
project charter

A ___________________________ emphasizes who is responsible for each work item and
shows each individual's role in supporting the overall project. - Answer Responsibility
Assignment Matrix

Although major or key deliverables may be stated in the project charter or the request
for proposal, they need to be _______________ in the project scope document. - Answer
expanded on in greater detail

Which of the following is not an example of a project?

A. Starting up a new business

B. Building vehicles on an assembly line

,C. Creating a website for your customer

D. Designing a new product for your company to manufacture & sell

E. Planning a family vacation to Jamaica - Answer B. Building vehicles on an assembly
line

T/F One way to determine which activities are on the critical path is to determine which
activities have the least slack - Answer True

When building a project schedule from a network diagram, the number listed as "the
estimated duration" for each activity must be --

A. the time you estimate that a resource will physically do work on this task

B. the time you estimate for the task to be completed plus the planning time for the
project.

C. the time you estimate for the work to be done plus any associated waiting time.

D. the time you estimate as the required time for the work times the number of
resources assigned to the project.

E. the time you estimate for the task plus the time to review and accept the deliverable. -
Answer C. the time you estimate for the work to be done plus any associated waiting
time.

The ES and EF are times determined by calculating....

A. forward... that is by working through the network diagram from the beginning of the
project to the end of the project.

B. backward... that is by working through the network diagram from the end of the
project back to the beginning of the project.

C. both directions... first you work the schedule forward, and then you work the
schedule backward. - Answer A. forward... that is by working through the network
diagram from the beginning of the project to the end of the project.

Free slack is the amount of time a specific activity can be - Answer Postponed without
delaying the earliest start time of its immediately succeeding activities

Resource leveling, or "smoothing", is a method for - Answer Developing a schedule that
attempts to minimize the fluctuations in requirements for resources

A project is presently in the financial situation as described by these four bullets.

• CBC = $12,000

• CAC = $15,000

, • CEV = $16,000

• TBC = $24,000

Calculate the CPI of this project at the present time. - Answer 1.067

A project is presently in the financial situation as described by these four bullets.

• CBC = $12,000

• CAC = $15,000

• CEV = $16,000

• TBC = $24,000

Calculate the Cost Variance of this project at the present time. - Answer $1,000

Why are activities drawn in a serial relationship in a network diagram? - Answer From a
technical standpoint, the activities must be performed in that sequence

A resource requirements plan illustrates - Answer The expected utilization of resources
by time period during the project

A project risk is... - Answer an uncertain event that, if it occurs, can jeopardize
accomplishing the project objective.

Some level of risk planning should be done during ____________________ of the project life
cycle to make sure that a contractor understands the risks involved with bidding on a
proposed project. With knowledge of potential risks, the contractor can include
contingency or management reserve amounts in the bid price. - Answer the initiating
phase

Project prices and budgets should include ______________________ to pay for additional
costs associated with implementing response plans. - Answer a contingency or
management reserve

Risks should be prioritized based on ________________________________. - Answer the
likelihood of occurrence and degree of impact

The purpose of identifying and documenting lessons learned is to capitalize on the
knowledge and experience gained on the project in order to - Answer improve
performance on future projects.

T/F There may be circumstances that require a project to be terminated early, before all
of the objectives are completed. In these cases, a project manager should typically skip
the closing phase of the project life cycle. - Answer False

When a customer requests a project scope change, the project manager
should_____________________ - Answer work with the project team to analyze the effect of

Written for

Institution
NDSU
Course
NDSU

Document information

Uploaded on
October 30, 2024
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Flat West Virgina University
Follow You need to be logged in order to follow users or courses
Sold
39
Member since
1 year
Number of followers
5
Documents
2117
Last sold
2 months ago

3.6

5 reviews

5
1
4
2
3
1
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions