2025 Actual Exam from Credible Sources with 75
Questions and Verified Correct Answers Golden
Ticket to Guaranteed A+ Verified by Professor
According to story card best practices, is it advisable to change a requirement number?
- CORRECT ANSWER: No. A requirement number should not be changed after the
requirement has been published.
Based on the best practices for conducting an elaboration workshop, what should be
the starting point? - CORRECT ANSWER: Use standard workflows and screens of the
base configuration
During the Deployment phase, what happens during the Pilot step? - CORRECT
ANSWER: - Allow a subset of users to use the system
- Gather feedback
- Triage feedback
- Implement changes as needed
During the Stabilization phase, what is the purpose of performance testing? -
CORRECT ANSWER: Run tests to check how well the system works in anticipated and
peak loads.
During the support phase, who is responsible for monitoring business processes? -
CORRECT ANSWER: Support team
How and when do we estimate tasks? - CORRECT ANSWER: Hours. Only in the
current sprint as part of sprint planning.
How do we estimate stories? When is this activity done? - CORRECT ANSWER: Points.
At the start of the project and also validated during each sprint.
, Name 3 benefits of the Guidewire Agile Approach/Methodology. - CORRECT ANSWER:
-Leverage Guidewire content for common needs
-Implementation model optimized for P&C
-Focus on Value, Delivery, Knowledge Transfer
Name five responsibilities of a Business Analyst on a Guidewire Project. - CORRECT
ANSWER: -Work with end users to understand business requirements
-Act as a liaison with all stakeholders to ensure clear communication between business
and technological groups.
-Document business requirements including example maps, high-level process flows,
business rules, forms, and typelist values.
-Participate in application specification discussions to define functional requirements
and workflows.
-Work closely with developers and quality analysts during sprint execution so the right
features are built.
Name some common examples of InsuranceSuite integrations. - CORRECT ANSWER:
User authentication
Geocoding
Check printing
Document production
Document management
Address verification
Name three best practices from Inception. - CORRECT ANSWER: Utilize an agile
methodology, map business case to the themes /subthemes, estimate stories using
points, introduce base product features and functionality, document key requirements
on story cards, avoid deep discussions about detailed requirements, manage time
judiciously, assess product alignment for each user story, create new story cards for gap
stories, define a delivery backlog at the end of inception, assess business value to help
prioritize the Delivery backlog.