Pro Tools Tier 4 Post Questions and Answers 2024
Pro Tools Tier 4 Post Questions and Answers 2024 What 4 pieces of AVID hardware are needed for a satellite? - answer-- Pro Tools HD rig - AVID sync HD interface - Video monitors - Another Pro Tools system What 3 physical connections are needed for a satellite? - answer-- CAT5 or CAT6 cable with an RJ-45 connection - Blackburst or tri-level sync connection - A video connection (HDMI, Composite, etc) What kind of cable and wiring is needed for a computer connecting through a router or switch to another computer? - answer-CAT5 or CAT6, Straight-through What is needed to send video to TV monitors in the studio or control room? - answer-An HDMI splitter What 4 things should all Pro Tools rigs share? - answer-- Same timecode frame rate - Same format (PAL, NTSC...) - Correct clock and source settings (blackburst or trilevel sync) - The same network What should the subnet mask be set to for all connected Pro Tools rigs? - answer-255.255.0.0 Class B
Written for
- Institution
- Pro Tools Tier 4
- Course
- Pro Tools Tier 4
Document information
- Uploaded on
- November 2, 2024
- Number of pages
- 3
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pro tools tier 4 post questions and answers 2024