(VERSION A AND B) 400 QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100% CORRECT) /ALREADY
GRADED A+
Product Management is responsible for "what gets built" as defined by the Vision,
Roadmap, and what else?
A) Program Backlog
B) Customers
C) Key Stakeholders
D) PI Planning - ANSWER: Program Backlog
Which activity happens in the Inspect and Adapt Workshop?
A) A retrospective of the iteration
B) Planning the next PI
C) A demo of the integrated system
D) Refreshing the Program Backlog - ANSWER: A demo of the integrated system
When is the system demo conducted during program execution?
A) At the end of every iteration
B) On demand
C) Midway through the Program Increment
D) When Features are done - ANSWER: At the end of every iteration
Which statement is true about iteration planning?
A) It is required for every iteration to enable fast learning cycles
B) It is only required for every third iteration
C) It is required for component teams but may not be required for feature teams
that have no dependencies on other teams
D) It is not required for teams that consistently meet their PI Objectives - ANSWER: It
is required for every iteration to enable fast learning cycles
A user story includes which three things? (Choose three)
A) How
B) Why
C) What
D) Where
E) Who
F) When - ANSWER: Who, What, and Why
A decrease in variability leads to an increase in what?
A) Predictability
B) Risk
C) Cost
D) Length - ANSWER: Predictability
, What is the one key benefit of a Backlog Refinement session?
A) It allows the team to state the problem and then think about, what where when
and impact
B) It serves a variety of purposes, including a dedicated time for planning,
retrospective, exploring and innovating
C) It is the main way in SAFe for achieving relentless improvement
D) It provides time to identify dependencies and issues that could impact the next
iteration - ANSWER: It provides time to identify dependencies and issues that could
impact the next iteration
What are two behaviors of an effective Scrum Master? (Choose two)
A) To focus on their own objectives and limit interaction with Product Owner
B) To work with stakeholders and subject matter experts to define the Epic and its
potential benefits
C) To act as a servant leader and exhibit Lean-Agile leadership
D) To ensure no changes are made to the scope during an iteration
E) To facilitate the teams progress toward the iteration goals - ANSWER: To act as a
servant leader and exhibit Lean-Agile leadership and to facilitate the teams progress
towards the iteration
What statement is true about features and stories?
A) Features should be small enough to fit into an iteration
B) Each feature should have at least five stories
C) Features can be larger than an iteration but Stories should be small enough to fit
into an iteration
D) Stories can be broken into features - ANSWER: Each feature should have at least
five stories
Which statement defines the purpose of Iteration Planning (IP)?
A) It is to break stories into tasks that are achievable in the team's capacity
B) It is to explore and implement program Epics and split them into Features to be
further explored
C) It is to organize the work and define a realistic scope for the iteration
D) It is to analyze, approve, and ready Features for implementation - ANSWER: It is
to organize the work and define a realistic scope for the iteration
What is the major benefit for reducing batch size?
A) Increase throughput
B) Decrease stress on the system
C) Increase visibility
D) Increase Work-In-Progress - ANSWER: Increase throughput
Develops and delivers solutions incrementally, using a series of fixed-length
iterations within a Program Increment (PI) timebox and aligns teams to a common
business and technology mission. - ANSWER: Agile Release Train