Term 1 of 94
What are three most expensive items that are the first sheet of the SSC new student center
schedule of values document ?
Supervision
Prequalification
R.s. Means
HVAC, Masonry, Electrical
Term 2 of 94
A certain percentage of money owed to the contractor withheld to encourage completion of the
project is known as:
Application For Payment
Liquidated Damages
Retainage
Retention
Term 3 of 94
When do you know the true accuracy of your estimate?
When the project is halfway done and initial costs are assessed
Only after receiving feedback from the client about the estimate
Before starting the project to ensure funding is available
As soon as you complete the project and pay all the bills for labor and material
,Term 4 of 94
Which of the following are the primary sectors of the construction industry?
Pre-construction, Procurement, Construction, And Post-construction
Residential Renovation, Landscaping Services, Interior Design
Commercial Building, Industrial Construction, Heavy Civil Construction
Real Estate Development, Property Management, Urban Planning
Term 5 of 94
Which of the following is primary designer in a construction project?
MEP Engineer, Civil Engineer, Architect, Interior Designer
Construction Laborer, Equipment Operator, Electrician, Plumber
Project Manager, Site Supervisor, Safety Officer, Quality Control Inspector
Structural Engineer, Geotechnical Engineer, Surveyor, Urban Planner
Term 6 of 94
An electronic pen-shaped stylus or mouse curser used in conjunction with software to assist the
take-off task is a
Lcd Panel
Inverter
Digitizer
Touch Screen
,Term 7 of 94
Today, when hand-drafted plans are reproduced, the product is referred to as_______.
Green Sheets
Red Prints
Black Copies
Blue Lines
Term 8 of 94
Which one of the below that is an indirect cost
Prequalification
Leadership
Self-direction
Supervision
Term 9 of 94
Name two procurement instruments used to buy out a job.
Sub-contracts & Purchase orders
Punch-out & commisioning
Prequalification
Final documentation & inspection
, Term 10 of 94
The order of increasing cost and time commitment for the dispute resolution options is:
Mep Engineer, Civil Engineer, Architect, Interior Designer
Mediation, Minitrial, Arbitration, Litigation
Prequalification
Standards Of Workmanship, Material Quality, Methods Of Installation
Term 11 of 94
The Mediator's decision is________, and an Arbitrator's decision is ___________.
Advisory, Final
Temporary, Permanent
Nonbinding, Binding
Optional, Mandatory
Definition 12 of 94
Electric bill to for temp power for the sub-contractors to install the MEP and plumbing, One
superintendent, two assistant superintendents, and filed engineer in the job trailer at the
construction site, Nightly security guards to make sure the building materials are not stolen
Which are preparation steps taken to start the estimating process when competing for a
project?
What is an example of when an RFI is necessary?
What items are part of the general conditions?
What is the name of the stone carvings dating back to the pyramids that contained the first
written regulations pertaining to construction, commonly referred to as the first known
building code?
94 Multiple choice questions
Term 1 of 94
What are three most expensive items that are the first sheet of the SSC new student center
schedule of values document ?
Supervision
Prequalification
R.s. Means
HVAC, Masonry, Electrical
Term 2 of 94
A certain percentage of money owed to the contractor withheld to encourage completion of the
project is known as:
Application For Payment
Liquidated Damages
Retainage
Retention
Term 3 of 94
When do you know the true accuracy of your estimate?
When the project is halfway done and initial costs are assessed
Only after receiving feedback from the client about the estimate
Before starting the project to ensure funding is available
As soon as you complete the project and pay all the bills for labor and material
,Term 4 of 94
Which of the following are the primary sectors of the construction industry?
Pre-construction, Procurement, Construction, And Post-construction
Residential Renovation, Landscaping Services, Interior Design
Commercial Building, Industrial Construction, Heavy Civil Construction
Real Estate Development, Property Management, Urban Planning
Term 5 of 94
Which of the following is primary designer in a construction project?
MEP Engineer, Civil Engineer, Architect, Interior Designer
Construction Laborer, Equipment Operator, Electrician, Plumber
Project Manager, Site Supervisor, Safety Officer, Quality Control Inspector
Structural Engineer, Geotechnical Engineer, Surveyor, Urban Planner
Term 6 of 94
An electronic pen-shaped stylus or mouse curser used in conjunction with software to assist the
take-off task is a
Lcd Panel
Inverter
Digitizer
Touch Screen
,Term 7 of 94
Today, when hand-drafted plans are reproduced, the product is referred to as_______.
Green Sheets
Red Prints
Black Copies
Blue Lines
Term 8 of 94
Which one of the below that is an indirect cost
Prequalification
Leadership
Self-direction
Supervision
Term 9 of 94
Name two procurement instruments used to buy out a job.
Sub-contracts & Purchase orders
Punch-out & commisioning
Prequalification
Final documentation & inspection
, Term 10 of 94
The order of increasing cost and time commitment for the dispute resolution options is:
Mep Engineer, Civil Engineer, Architect, Interior Designer
Mediation, Minitrial, Arbitration, Litigation
Prequalification
Standards Of Workmanship, Material Quality, Methods Of Installation
Term 11 of 94
The Mediator's decision is________, and an Arbitrator's decision is ___________.
Advisory, Final
Temporary, Permanent
Nonbinding, Binding
Optional, Mandatory
Definition 12 of 94
Electric bill to for temp power for the sub-contractors to install the MEP and plumbing, One
superintendent, two assistant superintendents, and filed engineer in the job trailer at the
construction site, Nightly security guards to make sure the building materials are not stolen
Which are preparation steps taken to start the estimating process when competing for a
project?
What is an example of when an RFI is necessary?
What items are part of the general conditions?
What is the name of the stone carvings dating back to the pyramids that contained the first
written regulations pertaining to construction, commonly referred to as the first known
building code?