©THEBRIGHT EXAM SOLUTIONS 11/9/2024 2:18 PM Industrial storm water certified operator Exam Questions And Answers 100% Pass 1) Under natural conditions the majority of rain water that falls to the ground - answerInfiltrates the ground or evaporates 2) The introduction of pollutants to storm water most commonly occurs when industrial facilities allow operating procedures and industrial materials to - answerBecome exposed to storm water 3) The best way to prevent contamination of storm water is - answerThrough pollution prevention 4) The highest percentage of pollutants in storm water runoff occurs in the first few minutes that storm water runs off. This is called the __ - answerFirst flush 5) Organic enrichment of storm water runoff from sources such as food processing, airport deicing, antifreezes, and sewage create addition oxygen demand in lakes and streams. Much of the demand is due to bacteria feeding on these materials. The increased oxygen demand can lead to ____________________________________, which is a common cause of fish kills. - answerOxygen depletion 6) The addition of nitrogen and phosphorus to storm water runoff can result in algal blooms and excessive growth of aquatic plants in fresh water systems such as lakes and streams. In fresh water systems _____________________ is the main cause of excessive plant and algal growth. - answerPhosphorus 7) Sediment is one of the most widespread pollutants in surface water. Many ___________________________ attach to finer sediment particles. Sediment can also be destructive to aquatic systems by covering and damaging habitat - answerPollutants ©THEBRIGHT EXAM SOLUTIONS 11/9/2024 2:18 PM 8) Michigan law requires that anyone who discharges liquid wastes to surface waters of the state must have their pollution control measures under the supervision of a - answerCertified Operator 9) If there is a construction activity at an industrial facility that disturbs one or more acres of land or the soil disturbance is within 500 feet of a water body, the owner of the property will need to apply for a ___________________________ ___________________________________________ permit. In addition if the soil disturbance will become five or more acres in size the property owner will need to submit the Notice of Coverage application to the MDEQ, Water Resources Division. - answerSoil Erosion and Sedimentation Control 10) __________________ permits are not site specific and contain the minimum requirements for protecting water quality. - answerGeneral 11) The ______________________________________ is a document that authorizes the discharge of storm water under a general storm water permit. - answerCertificate of Coverage 12) __________________ permits are site specific and contain requirements such as regular sampling, monitoring, end of pipe treatment or effluent limits. - answerIndividual 13) There are two types of industrial storm water general permits in Michigan they are Storm Water from Industrial Activity and Storm Water with _________ ______________________________________. - answerRequired Monitoring or Special Use Areas 14) A facility that has the industrial storm water general permit with required monitoring or special use areas is required to conduct a - answerShort Term Storm Water Characterization Study 15) An annual fee will be assessed to all facilities that have permitted storm water discharges. All facilities that have authorization to discharge storm water on _________________________ will be responsible for the annual fee. - answerJanuary 1 16) Industrial facilities are identified in the federal storm water regulations by

Meer zien Lees minder
Instelling
Industrial Storm Water Certified Operator
Vak
Industrial storm water certified operator

Voorbeeld van de inhoud

©THEBRIGHT EXAM SOLUTIONS

11/9/2024 2:18 PM


Industrial storm water certified operator
Exam Questions And Answers 100% Pass


1) Under natural conditions the majority of rain water that falls to the ground - answer✔Infiltrates the
ground or evaporates

2) The introduction of pollutants to storm water most commonly occurs when

industrial facilities allow operating procedures and industrial materials to - answer✔Become exposed to
storm water

3) The best way to prevent contamination of storm water is - answer✔Through pollution prevention

4) The highest percentage of pollutants in storm water runoff occurs in the first

few minutes that storm water runs off. This is called the __ - answer✔First flush

5) Organic enrichment of storm water runoff from sources such as food

processing, airport deicing, antifreezes, and sewage create addition oxygen

demand in lakes and streams. Much of the demand is due to bacteria feeding

on these materials. The increased oxygen demand can lead to

____________________________________, which is a common cause of fish

kills. - answer✔Oxygen depletion

6) The addition of nitrogen and phosphorus to storm water runoff can result in

algal blooms and excessive growth of aquatic plants in fresh water systems

such as lakes and streams. In fresh water systems _____________________

is the main cause of excessive plant and algal growth. - answer✔Phosphorus

7) Sediment is one of the most widespread pollutants in surface water. Many

___________________________ attach to finer sediment particles. Sediment

can also be destructive to aquatic systems by covering and damaging habitat - answer✔Pollutants

, ©THEBRIGHT EXAM SOLUTIONS

11/9/2024 2:18 PM

8) Michigan law requires that anyone who discharges liquid wastes to surface

waters of the state must have their pollution control measures under the

supervision of a - answer✔Certified Operator

9) If there is a construction activity at an industrial facility that disturbs one or

more acres of land or the soil disturbance is within 500 feet of a water body, the

owner of the property will need to apply for a ___________________________

___________________________________________ permit. In addition if the

soil disturbance will become five or more acres in size the property owner will

need to submit the Notice of Coverage application to the MDEQ, Water

Resources Division. - answer✔Soil Erosion and Sedimentation Control

10) __________________ permits are not site specific and contain the

minimum requirements for protecting water quality. - answer✔General

11) The ______________________________________ is a document that

authorizes the discharge of storm water under a general storm water permit. - answer✔Certificate of
Coverage

12) __________________ permits are site specific and contain requirements

such as regular sampling, monitoring, end of pipe treatment or effluent limits. - answer✔Individual

13) There are two types of industrial storm water general permits in Michigan

they are Storm Water from Industrial Activity and Storm Water with _________

______________________________________. - answer✔Required Monitoring or Special Use Areas

14) A facility that has the industrial storm water general permit with required

monitoring or special use areas is required to conduct a - answer✔Short Term Storm Water
Characterization Study

15) An annual fee will be assessed to all facilities that have permitted storm

water discharges. All facilities that have authorization to discharge storm water

on _________________________ will be responsible for the annual fee. - answer✔January 1

16) Industrial facilities are identified in the federal storm water regulations by

, ©THEBRIGHT EXAM SOLUTIONS

11/9/2024 2:18 PM

_________________________________________ and narrative description - answer✔Standard
Industrial Classification (SIC) Code

17) The surface water that receives the point source discharge is called the

________________________________. This information must be included on

the Notice of Intent (NOI) application when applying for the storm water

discharge coverage - answer✔Receiving Waters

18) Surface waters of the state include __________________, ____________,

________________, and ___________________________. - answer✔Rivers

Lakes

Streams

Wetlands

19) A ___________________________________ is any discernible, confined,

and discrete conveyance that discharges storm water into surface waters.

Examples include, but are not limited to, pipes, ditches, channels, tunnels,

conduits, conduits, or anything that conveys storm water into surface waters. - answer✔Point Source
Discharge

20) A discharge point that directs waste water, including storm water to a storm

sewer is called a/an _________________________. - answer✔Point of Discharge

21) A discharge point that directs waste water, including storm water to surface

waters of the state is called a/an ___________________________

_____________________. - answer✔Outfall

22) A sewer system in which the storm water is kept separate from sanitary

sewage and discharges directly into a surface water body is called a ________

_____________________________________________. - answer✔Separate Storm Sewer System

23) A sewer system in which the sanitary sewage and the storm water are

combined and are directed to a wastewater treatment plant is called a _______

_____________________________________________. - answer✔Combined Sewer System

Geschreven voor

Instelling
Industrial storm water certified operator
Vak
Industrial storm water certified operator

Documentinformatie

Geüpload op
11 november 2024
Aantal pagina's
16
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Thebright Florida State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
219
Lid sinds
1 jaar
Aantal volgers
7
Documenten
13788
Laatst verkocht
1 week geleden
Topscore Emporium.

On this page, you find verified, updated and accurate documents and package deals.

3.6

42 beoordelingen

5
15
4
10
3
9
2
3
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen