CISEC EXAM LATEST UPDATE 2024 Who has the responsibility to make sure that maintenance has been performed on the best management practices? - CORRECT ANSWER Contractor and Inspector Who has the responsibility to make sure that control measures are properly selected, installed, and maintained? - CORRECT ANSWER Designer, Inspector, and Contractor T/F: The NPDES permit authorizes operators to discharge pollutants in the manner that makes most sense for the site. - CORRECT ANSWER False T/F: The EPA must grant approval for cationic flocculants. - CORRECT ANSWER True T/F: The goal of the NPDES permit is to eliminate all discharge of pollutants from a construction site. - CORRECT ANSWER False: minimize T/F: The EPA is adamant that BMPs only be installed during the early phases of construction site development. - CORRECT ANSWER False Inspections must be done within 24 hours of a storm event which has or greater of rainfall. - CORRECT ANSWER 0.25 inches T/F: The SWPPP should always include the frequency of inspections - CORRECT ANSWER True T/F: Inspections should occur even in conditions that are unsafe to personnel. - CORRECT ANSWER False After identifying issues, the SWPPP should be updated and updates must occur within - CORRECT ANSWER 7 calendar days What method of erosion is marked by the bounding of soil particles? - CORRECT ANSWER Saltation Where does runoff flow? - CORRECT ANSWER From high point to low point Offsite flows must be BLANK if they can't be BLANK - CORRECT ANSWER Treated; diverted What is hydrology? - CORRECT ANSWER The study of water What are sources of water - CORRECT ANSWER Precipitation (rain, snow, hail, sleet) Rate of flow depends on what 6 variables? - CORRECT ANSWER Soil types and roughness

Show more Read less
Institution
Course

Content preview

CISEC EXAM LATEST UPDATE 2024

Who has the responsibility to make sure that maintenance has been performed on the
best management practices? - CORRECT ANSWER Contractor and Inspector

Who has the responsibility to make sure that control measures are properly selected,
installed, and maintained? - CORRECT ANSWER Designer, Inspector, and Contractor

T/F: The NPDES permit authorizes operators to discharge pollutants in the manner that
makes most sense for the site. - CORRECT ANSWER False

T/F: The EPA must grant approval for cationic flocculants. - CORRECT ANSWER True

T/F: The goal of the NPDES permit is to eliminate all discharge of pollutants from a
construction site. - CORRECT ANSWER False: minimize

T/F: The EPA is adamant that BMPs only be installed during the early phases of
construction site development. - CORRECT ANSWER False

Inspections must be done within 24 hours of a storm event which has or greater of
rainfall. - CORRECT ANSWER 0.25 inches

T/F: The SWPPP should always include the frequency of inspections - CORRECT
ANSWER True

T/F: Inspections should occur even in conditions that are unsafe to personnel. -
CORRECT ANSWER False

After identifying issues, the SWPPP should be updated and updates must occur within -
CORRECT ANSWER 7 calendar days

What method of erosion is marked by the bounding of soil particles? - CORRECT
ANSWER Saltation

Where does runoff flow? - CORRECT ANSWER From high point to low point

Offsite flows must be BLANK if they can't be BLANK - CORRECT ANSWER Treated;
diverted

What is hydrology? - CORRECT ANSWER The study of water

What are sources of water - CORRECT ANSWER Precipitation (rain, snow, hail, sleet)

Rate of flow depends on what 6 variables? - CORRECT ANSWER Soil types and
roughness

, Storm intensity and duration
Contributing areas
Steepness of terrain
Length of slope
Vegetative cover

What is a hydrograph? - CORRECT ANSWER Picture of runoff
X-Axis: flow in cubic feet per second (cfs)
Y-Axis: time in minutes
Peak = maximum flow during runoff event

What is a sedigraph? - CORRECT ANSWER Represents sediment discharge
X-Axis: sediment yield rate
Y-Axis: time
When working in waterways or wetlands, which permit is required? - CORRECT
ANSWER 404 Permit

NPDES - CORRECT ANSWER National Pollutant Discharge Elimination System
Section of CWA (Clean Water Act) to permit stormwater discharges associated with
industrial activities per the permit

CWA Penalty Types - CORRECT ANSWER Class I. Negligent
Class II. Knowingly = Greater Fines

What documents are required onsite? - CORRECT ANSWER SWPPP
CGP
Site Map
Drawings and Key
All inspection reports
Any amendments to SWPPP

Who is the "Operator" - CORRECT ANSWER Usually the OWNER of the site, not the
contractor, unless authorized by the owner to general contractor to have day-to-day
operational control

Vertical Projects - CORRECT ANSWER Homebuilding, smaller residential construction
projects
Usually multiple subcontractors
Requires a lot of housekeeping

LDP - CORRECT ANSWER Land Developing Projects - altering landscape for projects

Big Box Projects - CORRECT ANSWER Commercial buildings
Mass grading and mass chaos
Limits site access and continually changing (high activity)

Written for

Course

Document information

Uploaded on
November 13, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$18.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
janetheuri
3.0
(1)

Get to know the seller

Seller avatar
janetheuri Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
1 year
Number of followers
0
Documents
517
Last sold
10 months ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions