Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

PROJECT RISK MANAGEMENT EXAM

Beoordeling
-
Verkocht
-
Pagina's
13
Cijfer
A+
Geüpload op
17-11-2024
Geschreven in
2024/2025

PROJECT RISK MANAGEMENT EXAM

Instelling
Vak

Voorbeeld van de inhoud

PROJECT RISK MANAGEMENT EXAM / PJM 6015 FINAL
LATEST ACTUAL EXAM REAL QUESTIONS AND CORRECT
DETAILED ANSWERS (CORRECT VERIFIED ANSWERS)
LATEST UPDATED VERSION |ALREADY GRADED A+
(BRAND NEW!!)
Which is an attribute of a project? - ANSWER: Projects are finite.

Which work activities should be treated as a project? - ANSWER: Relocating whole
departments within the same building.

Which is true of facility management (FM) organization projects? - ANSWER: Projects
can be initiated to address the results of programming.

Which is an example of the application of sound management techniques by a
project manager? - ANSWER: they break down a task further if it remains at the
same percent completion despite reported progress.

What does a project manager need to be successful? - ANSWER: Ability to hire,
discipline, and terminate project team members

Which is an advantage to using a standardized project management model? -
ANSWER: The model is a framework that project managers can adapt to project
specifics.

In the project model, what do outputs from the Plan phase become? - ANSWER:
inputs to the Do phase.

Which PMBOK Process Groups involves establishing the scope of the project and
defining the course of action? - ANSWER: Planning

An FM organization's policy specifies use of a predefined project management
process. What is a typical feature of such a process? - ANSWER: It lists specific
persons from whom to seek approvals.

A project has a long payback period. To what should the project be linked to increase
the chances the project will be approved? - ANSWER: Strategic facility plans

What should a facility management contractor get from its customer to initiate a
project? - ANSWER: Scope/statement of work

Which is set by policy at the start of a project? - ANSWER: Estimating

What constraint addresses sensitivity to organizational politics and influences how
projects are identified and prioritized? - ANSWER: Organizational culture

, Which source provides information about the facility and its components as they
exist prior to a new project? - ANSWER: Archived project data

What should project managers do at the start of a project to increase the chance of
success? - ANSWER: assure there is a shared understanding of the end purpose of a
project.

Which is true of the steps involved in defining project success? - ANSWER: Specifying
nonessential parameters is as important as specifying essential ones.

When defining project success, after the business need is defined, what could be
used in the next step of the process? - ANSWER: Statement of requirements

Which documents includes details such as adjacency diagrams, space standards, and
information on current and future staffing count for business units? - ANSWER:
Statement of requirements

The tradeoffs made in the project triangle are part of which SMART (specific,
measurable, achievable, relevant, time-bound) element? - ANSWER: Relevant

Which statement is true of programming? - ANSWER: It makes projections similar to
forecasting but is more focused than forecasting.

In what document is the project manager formally listed? - ANSWER: Project charter

Which statement about project objectives is true? - ANSWER: Schedule
documentation only includes milestones for hard delivery dates.

An organization gathers data on occupant space requirements, desired location, and
desired cost per square meter (square foot). What other factors should be
considered when creating site selection criteria? - ANSWER: Desired floor
plan/stacking plan and desired amenities

Which statement is true about the design/engineering and acquiring space tasks? -
ANSWER: The final step in a building evaluation is usually generation of a test fit.

Which statement reflects good practice when it comes to managing project
communications? - ANSWER: Kickoff meetings are held each time persons join the
project team.

A performance bond is what type of risk response? - ANSWER: Transfer

In what contract model does the owner act as the general contractor? - ANSWER:
Multiple prime contracts

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
17 november 2024
Aantal pagina's
13
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
THEPROJECTOR

Maak kennis met de verkoper

Seller avatar
THEPROJECTOR Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
1 jaar
Aantal volgers
1
Documenten
1137
Laatst verkocht
2 weken geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen