Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
17-11-2024
Geschreven in
2024/2025

SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS

Instelling
Vak

Voorbeeld van de inhoud

SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS AND
CORRECT DETAILED ANSWERS (100% CORRECT VERIFIED
ANSWERS) |GUARANTEED PASS A+ (BRAND NEW!!)
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - ANSWER: Virginia Stormwater Management Act,
Virginia Stormwater Management Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - ANSWER: greater than or equal to an acre

The Stormwater Management Act requires the State Water Control Board to -
ANSWER: permit, regulate, and control stormwater runoff

DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts
upon request - ANSWER: 90

The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - ANSWER: staff of a stormwater program,
anyone contracted by a VSMP authority, standard and specification holders

The dual certificate will expire three years from - ANSWER: the latest date of the
certificates

SWM plan must be approved by ___ before land disturbance - ANSWER: VSMP
program authority

The water quality criteria sets a site-based load limit of ____ of total phosphorus for
new development - ANSWER: 0.41 lbs/acre/year

The phosphorus load limit uses the - ANSWER: 10% impervious cover

Part II B and II C water quantity criteria addresses - ANSWER: channel protection and
flood protection

Which two plans in the SWPPP must be approved? - ANSWER: SWM plan, ESC plan

Does the SWM plan address runoff during or after construction? - ANSWER: post-
construction

What is the lower limit of the range of imperviousness that can result in stream
degradation? - ANSWER: 10%

What do land disturbing activities consist of? - ANSWER: excavating, clearing, grading

, LDA threshold for the SWM Act and Regulation - ANSWER: 1 acre or 2500 square
feet for Chesapeake Bay Preservation Act

In situations where an initial exemption was applicable because LDAs were related to
emergency work, VSMP authority shall be advised of the disturbance within -
ANSWER: 7 days of commencing the LDA and shall submit a permit application
within 30 days of starting the land-disturbing activity

Localities with MS4 - ANSWER: must adopt and administer a stormwater program

Localities without MS4 - ANSWER: may choose to administer a VSMP or have DEQ
administer the program

DEQ is responsible for enforcing the ____ while locality ____ are responsible for
enforcing local ordinances - ANSWER: Construction GP, VSMP

A locality VSMP authority must include enforcement authority and a schedule of civil
penalties for enforcement actions in its local ordinance. The maximum penalty the
authority may issue is - ANSWER: $32,500 per violation per day

Any civil penalty assessed by a court as a result of a summons issued by a locality
VSMP authority must be paid - ANSWER: into the locality's treasury

Any person who violates..... shall be subject to a civil penalty not to exceed -
ANSWER: $32, 500

Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
equal to ____ and less than ____ - ANSWER: 2,500 ft^2, 1 acre

CBPA LDAs must have - ANSWER: approved E&SC plan, approved SWM plan, local
approval to start land disturbance, long-term maintenance agreement, construction
record drawings

CBPA LDAs do not require - ANSWER: Construction GP, Pollution prevention Plan,
Additional control measures to address TMDL

State entities and linear projects ___ submit a single set of standards and
specifications to DEQ for approval, federal entities ____ - ANSWER: must, may

Name the 5 steps in order of the permitting process - ANSWER: submittal of ESC
plans and SWM plans, SWM plan review and approval, registration statement entry
into Construction GP, Construction GP approved by DEQ, Locality VSMP authority
approval to start land disturbance

The locality VSMP authority has ___ days to determine the completeness of a
stormwater management plan and to notify the applicant of its determination -
ANSWER: 15

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
17 november 2024
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
THEPROJECTOR

Maak kennis met de verkoper

Seller avatar
THEPROJECTOR Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
1 jaar
Aantal volgers
1
Documenten
1137
Laatst verkocht
1 maand geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen