Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Commercial Contractor EXAM QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
20-11-2024
Written in
2024/2025

Commercial Contractors Certification - ANSWERis required to install any on-site sewage management system with a design flow greater than 2000 gallons per day Commercial tanks can be made of - ANSWERconcrete, plastic, fiberglass, or such other materials Larger septic tanks - ANSWERmay have to be constructed on-site Septic tanks are sized for - ANSWERthe daily 24 hour peak flow volume Septic tanks may be - ANSWERtrained togethe

Show more Read less
Institution
Course

Content preview

Commercial Contractor EXAM
QUESTIONS AND ANSWERS

Commercial Contractors Certification - ANSWER>>is required to install any on-site
sewage management system with a design flow greater than 2000 gallons per day

Commercial tanks can be made of - ANSWER>>concrete, plastic, fiberglass, or
such other materials

Larger septic tanks - ANSWER>>may have to be constructed on-site

Septic tanks are sized for - ANSWER>>the daily 24 hour peak flow volume

Septic tanks may be - ANSWER>>trained together

The volume of the first compartment must be at least - ANSWER>>two-thirds the
volume of the 24 hour flow

The minimum size septic tank must be - ANSWER>>1000 gallons

Garbage grinders require the septic tank to be increased by - ANSWER>>fifty
percent (50%)

All tanks shall be equipped with tees that are - ANSWER>>four-inch (4") PVC,
ASTM 3034 rated or equivalent

Tees shall be located at the - ANSWER>>inlet and outlet ends of the tank

Tees shall be constructed so that they extend - ANSWER>>a minimum of 25% and
a maximum of 50% of the total liquid depth

, The invert of the outlet tee shall be located - ANSWER>>two inches (2") below the
invert of the inlet tee

Outlet tees shall be equipped with - ANSWER>>an effluent filter

The effluent filter on the outlet tee shall be designed to handle BOTH -
ANSWER>>the daily flow volume and wastewater characteristics

All tanks shall be constructed - ANSWER>>so the length is at least one and one
half (1 1/2) times the width

All tanks shall have - ANSWER>>two (2) compartments

Tank compartment partitions shall not be located no less than - ANSWER>>two-
thirds (2/3) or more than three-fourths (3/4) the length of the tank from the inlet
end

Compartment partitions will be constructed - ANSWER>>with a pass-thru hole or
slot

Pass-thru hole or slots shall be constructed so that it is - ANSWER>>equal to or
grater than the diameter of the inlet pipe and is positioned below the liquid
surface of a minimum of 25% to a maximum of 50% total liquid depth

Total liquid depth for larger poured-in-place tanks shall be a maximum of -
ANSWER>>sixty-six inches (66")

The walls and bottoms of poured-in-place septic tanks - ANSWER>>must be
reinforced

Septic tanks shall be reinforced by using - ANSWER>>six inch by six inch (6"x6")
No. 10 gage welded steel reinforcing wire,
or

Written for

Course

Document information

Uploaded on
November 20, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$20.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Profcharleswellington
5.0
(1)

Get to know the seller

Seller avatar
Profcharleswellington Princeton university
Follow You need to be logged in order to follow users or courses
Sold
5
Member since
2 year
Number of followers
0
Documents
1316
Last sold
4 months ago
Stuvia online

Stuvia study material for exel in academics

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions