NERC TEST 2 QUESTIONS AND ANSWERS A+ GRADED. Buy Quality Materials! Which of the following situations would warrant the Reliability Coordinator to initiate a NERC RC conference call? A. Energy Emergency Alert 3 B. Code of Conduct violation C. Interchange transaction error D. 115 kV capacitor tripping Energy Emergency Alert 3 The next day security analysis performed by the RC shall ensure that _________. A. the bulk power system can be operated in anticipated normal and contingency conditions B. all unavailable generation and transmission made available C. all interchange is scheduled D. the load forecast is within 5% of actual the bulk power system can be operated in anticipated normal and contingency conditions If the estimated charging incurred from switching a 500 kV line in service is 1.7 MVAR per mile, what would be incurred if a 100 mile long 500 kV line were switched in service? A. 85 MVAR B. 170 MVAR C. 850 MVAR D. It cannot be calculated with the information provided 170 MVAR All of the following are reasons to notify other systems through predetermined communication paths EXCEPT: A. Insufficient resources B. Lack of single contingency coverage C. Sabotage incident D. Loss of 10 MW of load Loss of 10 MW of load ? What would be the most likely event if the frequency in your Balancing Authority Area declines and the interchange out of your area increased? A. An internal generator tripped B. An external generator tripped C. Internal load was lost D. External load was lost An external generator tripped

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

NERC TEST 2 QUESTIONS AND ANSWERS A+
GRADED. Buy Quality Materials!
Which of the following situations would warrant the Reliability Coordinator to
initiate a NERC RC conference call?

A. Energy Emergency Alert 3
B. Code of Conduct violation
C. Interchange transaction error
D. 115 kV capacitor tripping
Energy Emergency Alert 3
The next day security analysis performed by the RC shall ensure that _________.

A. the bulk power system can be operated in anticipated normal and contingency
conditions
B. all unavailable generation and transmission made available
C. all interchange is scheduled
D. the load forecast is within 5% of actual
the bulk power system can be operated in anticipated normal and contingency
conditions
If the estimated charging incurred from switching a 500 kV line in service is 1.7
MVAR per mile, what would be incurred if a 100 mile long 500 kV line were
switched in service?

A. 85 MVAR
B. 170 MVAR
C. 850 MVAR
D. It cannot be calculated with the information provided
170 MVAR
All of the following are reasons to notify other systems through predetermined
communication paths EXCEPT:

A. Insufficient resources
B. Lack of single contingency coverage
C. Sabotage incident
D. Loss of 10 MW of load
Loss of 10 MW of load ?
What would be the most likely event if the frequency in your Balancing Authority
Area declines and the interchange out of your area increased?

A. An internal generator tripped
B. An external generator tripped
C. Internal load was lost
D. External load was lost
An external generator tripped

, What is the major role of the EMS State Estimator?

A. Identifies the contingencies that exist on the power system
B. Estimates the system load that is anticipated at the peak of the day
C. Calculates SE values based on telemetered data and system model
D. Establishes the values that the system operator must operate within
Calculates SE values based on telemetered data and system model
Which of the following is NOT an indication of pending voltage collapse?

A. Unusually low system voltages
B. All generators reaching maximum MVAR output
C. Voltages trending high and stable
D. Voltages not responsive to tap changes
Voltages trending high and stable
BA "A" is selling power to BA "C". The two lines between BA "A" and BA "C"
suddenly trip and lockout after two reclosing attempts. The tripping of the lines
has caused the line between BA "B" and BA "C" to exceed its emergency ratings.
Of the options provided, which would assist in returning the line loading to within
limits?

A. Increase generation in BA "A" and reduce load in BA "B"
B. Increase generation in BA "C" and reduce load in BA "B"
C. Decrease generation in BA "C" and reduce load in BA "C"
D. Increase generation in BA "C" and reduce load in BA "C"
Increase generation in BA "C" and reduce load in BA "C"
In order to be compliant with NERC Standards, what is the maximum time that it
can take a Transmission Operator to evacuate their primary control center and
get to their backup control center?

A. 30 minutes
B. 1 hour
C. 2 hours
D. 4 hours
2 hours
Which of the following devices would you use if you were calculating dynamic
reactive reserve for your system?

Shunt reactors
Transformers
Shunt capacitors
Generators
Generators
Because of the importance of telemetered data, it is imperative that the system
operator ensures that the values are verified:

A. Continuously

Geschreven voor

Vak

Documentinformatie

Geüpload op
20 november 2024
Aantal pagina's
7
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TopGradeSolutions Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
95
Lid sinds
2 jaar
Aantal volgers
9
Documenten
13297
Laatst verkocht
4 dagen geleden
TOPGRADESOLUTIONS

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lees meer Lees minder
4.9

171 beoordelingen

5
159
4
7
3
4
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen