SPECIAL PROJECT CIRCLE WRD TRICHIRAPPALLI- 620001.
Fowarding Slip toaccompany the Lump-Sum Agreement:
C.R. No. I Suppl. I2023-2024
to Original. Agreement No. 03/ LS/2020-21 Dated : 22.02.2021
1 Name of work Formation of flood carrier canal in 1st reach of Slice
(0.00km to 4.10km) in Karur district for the project of
Formation of canal from Cauvery(Kattalai) to south
vellar as the 1st Phase of Cauvery (kattalai)- Vellar
Manimuthar-Vaigai-Gundar to divert the flood wator
for sustaining drinking water needs and recharging
ground water in the drought prone areas of Karur,
Tiruchirapali and PudukottaiDistrit.
) Estimated Amount Rs. 171.00 Crores
Sanctioned inOrnginal Estimate CER. No. 67/CE(T)/2020-21
Originalor supplemental Supplemental
ifsuppiemental
a Original Agreement No. Superintending Engineer, WRD., Speclal Projoct
Circle, Trichy. Agreement No. 03/ LS 2020-21
Dated : 22.02.2021.
b) Supplemental agreement number: YES
# any, accepted previously. (Supplemental Slip No. 12023-24)
5 Approximate value of work to be Rs. 4,00,90,835/- (including GST 18% ) -
done under this agreement. (Work Value- Rs. 3,39,75,284/- +
GST 18% -Rs. 61,15,551/-)
6 If this is supplemental.
approximate value of work to be
done under
a) Orniginal agreement Rs.115,14,25,835/- (including GST 12% ) (Rupees
One hundred and fifteen Crore, fourteen lakhs,
twenty five thousand, eight hundred and thirty five
only)
b) Supplemental agreements, If any. : Yes. Supplemental Agreement 12021-2022
previously accepted. .Supplemental Agreement 12022-2023
7 If tenders have been called for, is : Supplemental Proposals approved by the
the lowest tender accepted? f not, Superintending Engineer, WRD., Special Project
the reasons recorded ? Circle, Trichy vide Ir No. F 04/DB/CVG-1
12023/Dated : .07.2023
Has the contractor signed in the : Yes.
copy of T.N.B.P. and its addenda
volume. of T.N.B.P. and its
addenda volume.
, of: Yes.
9 ls data furnished for all items
Work noted in the scherme ?
within Wth in the Original Estimate rates.
10 Are the rates in agreement
schedule of
the estimate rates or
rates whichever is less and are the
lump-sum provisions suffcient or
likely to be exceeded.
11 Additional inforrmation
Originalagreement
1) Original agreement amount of : OriginalExcess
Agreement
Rs. 3,35,26,416/
tender excess and percentage Tender
over the estimate rate. (OR) (+) 3.00 %
2) If concecciona! rates of EM.D.,
Security have been allowed,
Reference to sanction thereof.
) Supplemental agreements Rs. 4,00,90,835/- (ncluding GST 18%)
(Work Value- Rs. 3,39,75,284/- +
GST 18% - Rs. 61.15,551/-)
12 Whether the additional items are
i) Contingent and non-separable
i) Contingent and separable
Non-contingent and separable
i)
Item No value of each to be
quoted.
2) Whether orders of S.E or C.E or:
Government as the case may be,
obtained in case of contingent and
non-separable items as per G. O.
9.3.1961.
Ms. No. 667/ PWI Dt
Regarding orders to be quoted.
orders of C.E or
3) Whether
Government as the case may be,
case of
has thus obtained in the
or non
Ccontingent and separabie itemns.
separable If
Contingent and number
sanction
SO. reference to
to be quoted.
to substituted Original Agreement Item in Numbers
4) Give reference included in the
inems, If any, in the 49,50,51,52
agreement and the item
original/ supplemental agreement
former item
already accepted thevalue of the
Substitute and the
Substituted item vide
Superintending
Special Project Engineer, PWD, WRD.
Circle.(Vc), Trichy -1.
NEIVLi- s.
BLUK - 15,
Fowarding Slip toaccompany the Lump-Sum Agreement:
C.R. No. I Suppl. I2023-2024
to Original. Agreement No. 03/ LS/2020-21 Dated : 22.02.2021
1 Name of work Formation of flood carrier canal in 1st reach of Slice
(0.00km to 4.10km) in Karur district for the project of
Formation of canal from Cauvery(Kattalai) to south
vellar as the 1st Phase of Cauvery (kattalai)- Vellar
Manimuthar-Vaigai-Gundar to divert the flood wator
for sustaining drinking water needs and recharging
ground water in the drought prone areas of Karur,
Tiruchirapali and PudukottaiDistrit.
) Estimated Amount Rs. 171.00 Crores
Sanctioned inOrnginal Estimate CER. No. 67/CE(T)/2020-21
Originalor supplemental Supplemental
ifsuppiemental
a Original Agreement No. Superintending Engineer, WRD., Speclal Projoct
Circle, Trichy. Agreement No. 03/ LS 2020-21
Dated : 22.02.2021.
b) Supplemental agreement number: YES
# any, accepted previously. (Supplemental Slip No. 12023-24)
5 Approximate value of work to be Rs. 4,00,90,835/- (including GST 18% ) -
done under this agreement. (Work Value- Rs. 3,39,75,284/- +
GST 18% -Rs. 61,15,551/-)
6 If this is supplemental.
approximate value of work to be
done under
a) Orniginal agreement Rs.115,14,25,835/- (including GST 12% ) (Rupees
One hundred and fifteen Crore, fourteen lakhs,
twenty five thousand, eight hundred and thirty five
only)
b) Supplemental agreements, If any. : Yes. Supplemental Agreement 12021-2022
previously accepted. .Supplemental Agreement 12022-2023
7 If tenders have been called for, is : Supplemental Proposals approved by the
the lowest tender accepted? f not, Superintending Engineer, WRD., Special Project
the reasons recorded ? Circle, Trichy vide Ir No. F 04/DB/CVG-1
12023/Dated : .07.2023
Has the contractor signed in the : Yes.
copy of T.N.B.P. and its addenda
volume. of T.N.B.P. and its
addenda volume.
, of: Yes.
9 ls data furnished for all items
Work noted in the scherme ?
within Wth in the Original Estimate rates.
10 Are the rates in agreement
schedule of
the estimate rates or
rates whichever is less and are the
lump-sum provisions suffcient or
likely to be exceeded.
11 Additional inforrmation
Originalagreement
1) Original agreement amount of : OriginalExcess
Agreement
Rs. 3,35,26,416/
tender excess and percentage Tender
over the estimate rate. (OR) (+) 3.00 %
2) If concecciona! rates of EM.D.,
Security have been allowed,
Reference to sanction thereof.
) Supplemental agreements Rs. 4,00,90,835/- (ncluding GST 18%)
(Work Value- Rs. 3,39,75,284/- +
GST 18% - Rs. 61.15,551/-)
12 Whether the additional items are
i) Contingent and non-separable
i) Contingent and separable
Non-contingent and separable
i)
Item No value of each to be
quoted.
2) Whether orders of S.E or C.E or:
Government as the case may be,
obtained in case of contingent and
non-separable items as per G. O.
9.3.1961.
Ms. No. 667/ PWI Dt
Regarding orders to be quoted.
orders of C.E or
3) Whether
Government as the case may be,
case of
has thus obtained in the
or non
Ccontingent and separabie itemns.
separable If
Contingent and number
sanction
SO. reference to
to be quoted.
to substituted Original Agreement Item in Numbers
4) Give reference included in the
inems, If any, in the 49,50,51,52
agreement and the item
original/ supplemental agreement
former item
already accepted thevalue of the
Substitute and the
Substituted item vide
Superintending
Special Project Engineer, PWD, WRD.
Circle.(Vc), Trichy -1.
NEIVLi- s.
BLUK - 15,