OTM 300 Exam 1 With Complete Solutions 100% Verified
What is the term for stopping a machine when an abnormal condition is detected? -
ANSWER Jidoka
A one unit flow often requires a facility layout to minimize the need for _______ batching -
ANSWER transport
Non-value added work - ANSWER necessary because of how current process operates
Value-added work - ANSWER Necessary to transform flow unit from inputs to output the
customer wants
The more available time, the _______ the takt time - ANSWER Higher
Information turnaround time - ANSWER The time between creating a defect at an
upstream resource and detecting it at a downstream resource
Kanban System - ANSWER Production instructions are communicated to an upstream
step when there is consumption at a downstream step
Likely improvement method for a Demand Constrained process - ANSWER Reduce
costs
Likely improvement method for a Supply Constrained process - ANSWER Increase flow
rate
Taylor's Theory - ANSWER Workers are animals who need to be trained to perform work
in the manner designed by engineers
, Autonomation - ANSWER automation with a human touch
To implement a single unit flow, you should level: - ANSWER the demand rate
To implement a single unit flow, you should operate at: - ANSWER takt time
To implement single unit flow, you should implement which type of system? - ANSWER
Pull
Utilization is always ______ implied utilization - ANSWER equal to or less than
With multiple flow unit types, the bottleneck is the resource with the _________ implied
utilization - ANSWER Highest
The process is capacity constrained you compute the flow rate for a particular type of
flow unit you divide the demand rate by : - ANSWER the highest implied utilization
For the flow rates across units you: - ANSWER add the flows in each unit
To compute total demand rate for a resource - ANSWER you sum down the appropriate
row in the demand matrix entries
Implied utilization tells us. - ANSWER how much demand exceeds the capacity of the
process
Idle time - ANSWER worker time that is not used in the production of the finished
product
the "just right" batch size makes a trade-off between: - ANSWER capacity and inventory
What is the term for stopping a machine when an abnormal condition is detected? -
ANSWER Jidoka
A one unit flow often requires a facility layout to minimize the need for _______ batching -
ANSWER transport
Non-value added work - ANSWER necessary because of how current process operates
Value-added work - ANSWER Necessary to transform flow unit from inputs to output the
customer wants
The more available time, the _______ the takt time - ANSWER Higher
Information turnaround time - ANSWER The time between creating a defect at an
upstream resource and detecting it at a downstream resource
Kanban System - ANSWER Production instructions are communicated to an upstream
step when there is consumption at a downstream step
Likely improvement method for a Demand Constrained process - ANSWER Reduce
costs
Likely improvement method for a Supply Constrained process - ANSWER Increase flow
rate
Taylor's Theory - ANSWER Workers are animals who need to be trained to perform work
in the manner designed by engineers
, Autonomation - ANSWER automation with a human touch
To implement a single unit flow, you should level: - ANSWER the demand rate
To implement a single unit flow, you should operate at: - ANSWER takt time
To implement single unit flow, you should implement which type of system? - ANSWER
Pull
Utilization is always ______ implied utilization - ANSWER equal to or less than
With multiple flow unit types, the bottleneck is the resource with the _________ implied
utilization - ANSWER Highest
The process is capacity constrained you compute the flow rate for a particular type of
flow unit you divide the demand rate by : - ANSWER the highest implied utilization
For the flow rates across units you: - ANSWER add the flows in each unit
To compute total demand rate for a resource - ANSWER you sum down the appropriate
row in the demand matrix entries
Implied utilization tells us. - ANSWER how much demand exceeds the capacity of the
process
Idle time - ANSWER worker time that is not used in the production of the finished
product
the "just right" batch size makes a trade-off between: - ANSWER capacity and inventory