100% CORRECT ANSWERS
OCEW
On center each way
CSI
Construction specification institute
NIC
Not in contract
UNO
Unless noted otherwise
FF
Finish Floor
EWH
Electric waterheater
WC
Water closet (toilet)
Civil Plan
a profile plan
If GC doesn't perform work, why is there a take off practice?
GC is responsible; needs to know whats going on
3'-00"x 4'-00"
4'-00" is the height