rials Related Topics
d d
Workshop Solutions d
Code: CICNS
d Spring 2015 d
ThisdcopydisdgivendtodthedfollowingdstudentdasdpartdofdSchooldofdPEdcourse.dNotdalloweddtoddistributedtodoth
ers.
DandMesterd()
, SchooldofdPE WorkshopdQuestionsdanddSolutions
TABLE d OFd CONTENTS
dd
Preamble .................................................................................................................................3
WorkshopdQuestionsdanddSolutions .............................................................................................4
1. EarthworkdConstructiondanddLayout .................................................................................4
2. EstimatingdQuantitiesdanddCosts ....................................................................................19
3. ConstructiondOperationsdanddMethods ...........................................................................33
4. Scheduling .....................................................................................................................39
5. MaterialdQualitydControldanddProduction .........................................................................47
6. TemporarydStructures ....................................................................................................50
7. WorkerdHealth,dSafety,danddEnvironment........................................................................55
PracticedQuestion ..................................................................................................................57
Attention:
ThisdsymboldrepresentsdtopicsdwithindthedRefresherdCoursedthatdaredpartdofdth
edsubjectdmatterdwhichdwilldfurtherdhelpdyourdunderstanding.dThedinformationdi
sdintenteddfordself-
studydanddmaydnotdbedrevieweddduringdthedrefresherdcourse.dTakedadvantage
dofdyourdstudydtimedtodreviewdthedself-
studydquestionsdanddifdnecessary,daskdyourdinstructordtodprovidedadditionaldinformationdford
yourdunderstnading.
2
ThisdcopydisdgivendtodthedfollowingdstudentdasdpartdofdSchooldofdPEdcourse.dNotdalloweddtoddistributedtodoth
ers.
DandMesterd()
, SchooldofdPE WorkshopdQuestionsdanddSolutions
PREAMBLE
dd
Thedmaterialdprovideddindthedrefresherdcoursedisdintendeddfordinstructionaldusedonly.dThedd
esigndcodedreferencedanddsolutiondtechniquesdaredadguidedfordinstruction.d Thedreferenced
materialdincludeddhereindshoulddnotdbeduseddasdadsoledsourcedfordthedPEdExamdand/ordengi
neeringdpractice.
ThedNCEESdprovidesdupdatedddesigndCodedstandardsdindpreparationdofdthedexamdanddth
atdshoulddbedthedsourcedfordyourduse.dVisitdthedNCEESdwebsitedfordthedmostdcurrentdinfor
mationdregardingdthedPEdExamdanddconfirmdtheddesigndstandardsduseddfordthedtestdconstr
uction.
Alldsolutiondstepsdhavedbeendvetteddanddaredprovideddfordeasedofdinstruction.dTheredaredm
anydmethodsdthatdcandbeduseddtodarrivedatdadsolutiondwhichdfitdyourdspecificdeducationaldbac
kgrounddanddexperience.d Alternatedmethodsdanddcomputationaldtechniquesdbaseddondyo
urdfamiliaritydshoulddbedused.
Note: The intent of the workshop is to simulate the exam conte
d d d d d d d d d d d
nt with questions of equal complexity.
d d d d d
Each of the que d d d
stions is designed with a variable time-to-complete.
d d d d d d
The“six- d
minute rule” should not apply to each question. Time manage
d d d d d d d d d
ment is an important key during the exam. Practice the strateg
d d d d d d d d d d
y to examine the grouping of questions and start with the perce
d d d d d d d d d d d
ived easiest first.
d d
Not all questions may be reviewed due to time constraints during thew
d d d d d d d d d d d d
orkshop assignment. d
Solutions are available for download 24-
d d d d d
hours after the completion ofthe refresher class.
d d d d d d d
3
ThisdcopydisdgivendtodthedfollowingdstudentdasdpartdofdSchooldofdPEdcourse.dNotdalloweddtoddistributedtodoth
ers.
DandMesterd()
, SchooldofdPE WorkshopdQuestionsdanddSolutions
WORKSHOP d QUESTIONS d ANDd SOLUTIONS
dd
1.d EARTHWORK d CONSTRUCTION d ANDd LAYOUT
1. - Question d 130,000-
yd3 of banked soil from a borrow pit is stockpiled before being trucked to the
d d d d d d d d d d d d d d
jobsite. The soil has 18% swell andshrinkage of 8%. The final volume of the
d d d d d d d d d d d d d d d
compacted soil is most nearly:
d d d d d
a. 119,600-yd3
d
b. 124,600-yd3
d
c. 125,400-yd3
d
d. 135,400-yd3
d
Solution:
Shrinkagedisdmeasureddwithdrespectdtodthedbankdcondition.d
Vdcompactedd =d(100%d-d%dshrinkage)dVdbank
100%
Vdcompactedd=d(100%d-8%)d(130,000-yds3)d=d119,600-
yd3d(answer)d100%
2. - Question d A 30- d
ft wide trapezoidal shaped earthen stream diversion channel is cut along a
d d d d d d d d d d d d
2-
mile stretch of rolling level terrain. The depth of the channel at station 52+2
d d d d d d d d d d d d d
5 is 8’-6” deep and at station 53+75 is12’-
d d d d d d d d d
6” deep. The bottom of the channel is a constant 12-
d d d d d d d d d d
ft wide and parallel with the surface cut. The volume of excavated material
d d d d d d d d d d d d d
between the referenced stations is most nearly:
d d d d d d
a. d 1,225-yd3
b. d 1,225-ft3
c. d 1,415-yd3
d. d 32,225-ft3
Solution:dStepd1:dCalculatedtheddistancedbetweendstations:d53+7
5d–d52+25d =d 150-ft
Stepd2:dSketchdandddeterminedthedtrapezoidaldEnddAreadatdthedstations:
Stad52+25 Aread=dAd=d((ad+b)h)d÷d2d=d((30-ftd+d12-ft)8.5-ft)d÷d2d=d178.5-