107 QUESTIONS | WITH COMPLETE
SOLUTIONS!!
1 of
106
Ter
m
The owner/operator must maintain records of each repair_.
Give this one a try
later!
Local building official not at the ust, not at alt site
, For the remaining The UST or UST system is ineligible
operational life of the UST for delivery, deposit, or acceptance
system of product
Don't know?
2 of 106
Term
Stage I vapor recovery is a method of preventing vapors from
escaping into the environment by doing what?
Give this one a try later!
Underground storage tank not trucks, or all not redeposit
The local building official not all or none of these wtf
Don't know?
3 of 106
Term
New or replacement USTs and piping installed after________are
required to have secondary containment.
Give this one a try later!
, 30 0.2
2010 95%
Don't know?
4 of 106
Term
When manually measuring the product level in a tank, your gauge
stick must be able to measure the level of product in the tank to the
nearest ____.
Give this one a try later!
Filled with an inert solid material Vapor monitoring
One-eighth of an inch Spill bucket
Don't know?
, 5 of 106
Term
If the DEQ determines that a UST or UST system is out of
compliance with federal or state UST regulations, it may _.
Give this one a try later!
Initiate delivery prohibition
procedures not at the ust, not at alt site
Every day your facility
dispenses and/or receives One-eighth of an inch
fuel
Don't know?
6 of 106
Term
Which of the following is referred to as safe suction?
Give this one a try later!
Daily visual inspection of the spill
An electrical outlet at the facility bucket
not american Discriminating