Questions With Revised Correct
Detailed Answers
|ALREADY GRADED A+ PASS >>
BRAND NEW VERSION!!
1. Force Projection Process - ANSWER 1. Mobilization
2. Deployment
3. Sustainment
4. Redeployment
2. AFROGEN - ANSWER 1. Reset/Train
2. Ready
3. Available
3. Mobilization Phases - ANSWER 1. Planning
2. Alert
3. Home Station
4. Mobilization Station
5. POE
, 4. Deployment Phases - ANSWER 1. Pre-deployment activities.
2. Fort to Port
3. Port to Port
4. Port to Foxhole (RSO&I)
5. Air Mobility Command (AMC) - ANSWER > Provides strategic airlift.
> Designates Aerial Ports of Embarkation (APOE)
> Manages the Civil Reserve Air Fleet (CRAF)
6. Military Sealift Command (MSC) - ANSWER > Pre-positioned shipping.
> Sealift Program and surge shipping
> Manages the Ready Reserve Fleet
7. Military Surface Deployment Distribution Command (SDDC) - ANSWER >
Management of all DOD surface transportation shipments
--Land (ground and rail)
--Sea
> Designates and operates Seaports of Embarkation (SPOE) and is the DOD single
port manager
> Transportation Engineering Agency (SDDC TEA)
8. When loading military vehicles on flatcars, a minimum of how many inches
must be left between vehicles? - ANSWER 10 inches?