-Scalability - CORRECT ANSWER: What are the characteristics of an agile MIS
infrastructure?
-Alpha testing
-Development testing
-Integration testing
-System testing
-User acceptance testing
-Unit testing - CORRECT ANSWER: Which of the following are included in the different
forms of system testing?
-Decreased expenses
-Decreased processing errors
-Decreased response time
-Increased quantity or sales - CORRECT ANSWER: Which of the following are included
in tangible benefits?
-Hardware
-Software
-Networking
,-Data center - CORRECT ANSWER: Which of the following is a key area of a
technology recovery strategy?
-ISP
-NSP
-RSP - CORRECT ANSWER: Which of the following are included in network providers?
-LAN
-WAN
-MAN - CORRECT ANSWER: Which of the following are included in the network
categories?
-Phased implementation
-Parallel implementation
-Pilot implementation
-Plunge implementation - CORRECT ANSWER: Which of the following are included in
the different system implementation methods?
-Private cloud
-Public cloud
-Hybrid cloud
-Community cloud - CORRECT ANSWER: Which of the following is a cloud computing
environment?
-Scope
-Time
-Resources - CORRECT ANSWER: Which of the following are included in the triple
constraint?
-security breaches and theft
, -floods and earthquakes
-malicious internet attacks - CORRECT ANSWER: The information MIS infrastructure
supports the day-to-day business operations and plans for ____________.
A standard Internet protocol that provides the technical foundation for the public Internet
as well as for large numbers of private networks. - CORRECT ANSWER: What is
transmission control protocol/Internet protocol (TCP/IP)?
access point - CORRECT ANSWER: the computer or network device that serves as an
interface between devices and the network
Accessibility - CORRECT ANSWER: Refers to the varying levels that define what a user
can access, view, or perform when operating a system
An individual who is an expert in project planning and management, defines and
develops the project plan, and tracks the plan to ensure that the project is completed on
time and on budget. - CORRECT ANSWER: What is a project manager?
antivirus software - CORRECT ANSWER: scans and searches hard drives to prevent,
detect, and remove known viruses, adware, and spyware
attenuation - CORRECT ANSWER: represents the loss of a network signal strength
measured in decibels (dB) and occurs because the transmissions gradually dissipate in
strength over longer distances or because of radio interference or physical obstructions
such as walls
authorization - CORRECT ANSWER: the process of providing a user with permission
including access levels and abilities such as file access, hours of access, and amount of
allocated storage space
availability - CORRECT ANSWER: the system is operational during different time
frames