Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Mobile Crane NCCER Study Guide Questions and Answers 100% Pass

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
17-12-2024
Geschreven in
2024/2025

Mobile Crane NCCER Study Guide Questions and Answers 100% Pass When determining the "gross load" the best method is: - ANSWER -Get an accurate load weight and add the rigging By order of strength which is correct - ANSWER -Basket, Vertical, Choker Primary purpose for a roster sheave or auxiliary boom point sheave is to: - ANSWER -Separate the hoist line When the number of layers of rope on a drum increase the : - ANSWER -Allowable line pull decreases What is the minimum allowable distance from the crane and power lines under 50kV? - ANSWER -10' Eccentric main boom tip reeving casues - ANSWER -twisting of the boom How many randomly broken wires must there be to remove a running wire rope from service? - ANSWER -6 When working near power lines when is a signal person required? - ANSWER -When crane moves within a booms length of power lines When operating truck cranes what is the most unstable allowable quadrant of operation? - ANSWER - Side Tipping capacities of locomotive cranes are based on what % of tipping? - ANSWER -85% Should the load be applied when determining the proper boom angle? - ANSWER -YES 2 | P a g e Created by ©EmilyCharlene 2025. All rights reserved. What type of rope is recommended for a tagline around powerlines - ANSWER -Polypropylene what does two beeps of the horn indicate to people in the area - ANSWER -forward Load radius is the distance from the center of gravity of the suspended load to the: - ANSWER - Center of rotation What is the purpose of using a boom extension? - ANSWER -Increase height What do a jib and boom ext. have in common - ANSWER -Increase height What is the minimum design factor required for a right regular lay main boom or auxiliary hoist rope?` - ANSWER -3.5 How does the operator determine if the correct load chart is being used? - ANSWER -Matching serial numbers If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom angle remains constant you would expect the load radius to do what? - ANSWER -To be reduced How does the operator verify the LMs boom length or load radius reading? - ANSWER -accutal measurements If the rated capacity of the crane is above the solid line or within the shaded areas or has an asterisk next to it this means the capacity is based on: - ANSWER -85% tipping How many broken wires must be present in one strand of one lay for running wire rope to be removed from service? - ANSWER -3

Meer zien Lees minder
Instelling
Nccer Mobile Crane
Vak
Nccer mobile crane

Voorbeeld van de inhoud

1|Page




Mobile Crane NCCER Study Guide
Questions and Answers 100% Pass

When determining the "gross load" the best method is: - ANSWER ✔✔-Get an accurate load weight and

add the rigging


By order of strength which is correct - ANSWER ✔✔-Basket, Vertical, Choker


Primary purpose for a roster sheave or auxiliary boom point sheave is to: - ANSWER ✔✔-Separate the

hoist line


When the number of layers of rope on a drum increase the : - ANSWER ✔✔-Allowable line pull decreases


What is the minimum allowable distance from the crane and power lines under 50kV? - ANSWER ✔✔-10'


Eccentric main boom tip reeving casues - ANSWER ✔✔-twisting of the boom


How many randomly broken wires must there be to remove a running wire rope from service? -

ANSWER ✔✔-6


When working near power lines when is a signal person required? - ANSWER ✔✔-When crane moves

within a booms length of power lines


When operating truck cranes what is the most unstable allowable quadrant of operation? - ANSWER ✔✔-

Side


Tipping capacities of locomotive cranes are based on what % of tipping? - ANSWER ✔✔-85%


Should the load be applied when determining the proper boom angle? - ANSWER ✔✔-YES




Created by ©EmilyCharlene 2025. All rights reserved.

, 2|Page


What type of rope is recommended for a tagline around powerlines - ANSWER ✔✔-Polypropylene


what does two beeps of the horn indicate to people in the area - ANSWER ✔✔-forward


Load radius is the distance from the center of gravity of the suspended load to the: - ANSWER ✔✔-

Center of rotation


What is the purpose of using a boom extension? - ANSWER ✔✔-Increase height


What do a jib and boom ext. have in common - ANSWER ✔✔-Increase height


What is the minimum design factor required for a right regular lay main boom or auxiliary hoist rope?` -

ANSWER ✔✔-3.5


How does the operator determine if the correct load chart is being used? - ANSWER ✔✔-Matching serial

numbers


If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom angle remains

constant you would expect the load radius to do what? - ANSWER ✔✔-To be reduced


How does the operator verify the LMs boom length or load radius reading? - ANSWER ✔✔-accutal

measurements


If the rated capacity of the crane is above the solid line or within the shaded areas or has an asterisk next

to it this means the capacity is based on: - ANSWER ✔✔-85% tipping


How many broken wires must be present in one strand of one lay for running wire rope to be removed

from service? - ANSWER ✔✔-3


In a range diagram boom length and angle can be used to determine: - ANSWER ✔✔-Load radius


When making a multiple crane lift it is important for the operator to understand that - ANSWER ✔✔-the

weight may increase if the other crane lands the load first




Created by ©EmilyCharlene 2025. All rights reserved.

Geschreven voor

Instelling
Nccer mobile crane
Vak
Nccer mobile crane

Documentinformatie

Geüpload op
17 december 2024
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EmilyCharlene Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
494
Lid sinds
2 jaar
Aantal volgers
138
Documenten
22999
Laatst verkocht
1 week geleden
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.7

111 beoordelingen

5
51
4
18
3
16
2
7
1
19

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen