True or false: Eaton BR 2-pole breakers are the only breakers approved
for use in the IQ Combiner box. - ✔✔✔ Correct Answer > True
How is creating the installation sticker map different with an AC module
system vs. a stand-alone rail mounted inverter?
A. The installation map should be completed as the rows of modules
get installed
B. The installation map can be completed once all of the modules are
installed on the rail
C. There is no difference - ✔✔✔ Correct Answer > A. The installation
map should be completed as the rows of modules get installed
Enphase's disconnecting tool allows you to_____________
,A. Disconnect the Q Cable from the microinverter
B. Disconnect a module's MC4 connections from the microinverter
C. Pull the microinverter away from the mounting bracket on an AC
module
D. All of the above - ✔✔✔ Correct Answer > D. All of the above
True or false: To prepare an AC Module for installation, the
microinverter must be pulled out from the mounting bracket and
snapped into the installation ready position. - ✔✔✔ Correct Answer
> True
What do the letters AP mean when referring to AP mode?
A. access priority
B. access pass
C. all purpose
,D. access point - ✔✔✔ Correct Answer > D. access point
What must you take in into consideration so that the inverter doesn't
hit the rail when mounting the module?
A. Placement of the serial number stickers
B. Module spacing
C. End clamps and mid clamps
D. Clamping range - ✔✔✔ Correct Answer > D. Clamping range
What must be considered so microinverters don't hit rails when
mounting AC modules?
A. Concealed vs exposed end clamps and mid clamps
B. Placement of the serial number stickers
C. Module clamping areas and manufacturer allowable range
, D. Module spacing - ✔✔✔ Correct Answer > C. Module clamping
areas and manufacturer allowable range
The _____________ is used to connect the customer's site to
Enlighten?
A. GPS route
B. Google maps picture
C. Installation map
D. Activation - ✔✔✔ Correct Answer > D. Activation
Which of these best practices should be created prior to the day of
installation?
A. Installation map
B. GPS route
C. Drawing of the home