Exam Questions and Answers 100%
Solved
Foreman requests Track and Time on a section of track that includes a
switch. - ✔✔C of L, HLCS, Shunting the track?
Foreman requests Track and Time on a section of track that does NOT
include a switch. - ✔✔C of L & HLCS
Intermittent Track Indication appears on screen. - ✔✔Notify Chief & Signal
Call Desk of Indication.
Chief's approval & talk by signal to get train by indication.
Block Track section with indication.
Foreman reports broken rail. - ✔✔Check for affected Trains.
Notify Chief & Signal Call Desk.
Only Qualified Engineering Employee can walk trains over rail.
Apply Info Tag
1
©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.
, Foreman removes Siding - ✔✔Determine if needed to be put on track
bulletin.
Notify Chief.
Block Siding and Switches at the Siding
False Proceed Reported @ Control Point - ✔✔Stop All Trains
Notify Chief & Signal Call Desk
Apply OS Blocks to adjacent control points.
Crossing Gate Malfunction - ✔✔Fill Out Form & Notify Affected Trains
*One form per crossing affected.
Train Derail on MT1. X-Overs fouled. - ✔✔Ascertain, Secure, & Notify
ASN SID & Chief
Apply Blocking using Donut method since X-overs are fouled.
Single Light Engine Entering track between signals. - ✔✔Authority to enter
main track. Absolute protection.
Block Section of track where he will enter. Apply restrictive tags to
segments of track where he will be going.
Train reports proceed signal down on MT. - ✔✔Notify Engineer.
NO BLOCKING NEEDED
2
©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.