Updated 2024-2025.
The only way to create an Xactimate estimate is through XactAnalysis. - Answer: False
With an Internet connection, you can download and upload a XactAnalysis assignment. -
Answer: True
What are the steps in the 4-Step Estimating Process? - Answer: 1. Claim Info
2.Sketch
3.Estimate Items
4.Complete
It is mandatory to follow the 4-Step Estimating Process in its exact order. - Answer: False
, At the fundamental level of learning, it is recommended to add or create a project from the
Control Center tab. - Answer: False
Multiple addresses can be added through Insured Info. - Answer: True
There are three coverage types available in the Coverage/Loss section. Name them - Answer: a.
Dwelling
b. Other Structures
c. Contents
A deductible can be applied across all coverages or specific coverage only - Answer: True
Xactware surveys prices from contractors in the field. The unit prices the contractors provide are
______________ of costs and fees associated with performing the task, but ____________ of
any general overhead and profit percentage. - Answer: inclusive, exclusive
Image types that can be imported into a Company Header includes .tif, .gif, and .png. - Answer:
False
Name the four sections that comprise the Sketch window: - Answer: 1. Tools
2. Search
3. Sketch Workspace
4. Items
It is possible to view multiple levels of your Sketch diagram in 3-D View. - Answer: True
You can use the Missing Wall tool to delete a wall. - Answer: True
Changing the room dimensions is the same thing as changing the room shape - Answer: False