IRC Chapter 25 - Answers Plumbing Administration
IRC Chapter 26 - Answers General Plumbing Requirements
IRC Chapter 27 - Answers Plumbing Fixtures
IRC Chapter 28 - Answers Water Heaters
IRC Chapter 29 - Answers Water Supply and Distrobution
IRC Chapter 30 - Answers Sanitary Drainage
IRC Chapter 31 - Answers Vents
IRC Chapter 32 - Answers Traps
IRC Chapter 33 - Answers Storm Drainage
Existing building sewers that will serve a new system shall be _______________ ____________ to verify
that the piping is _______ in the correct direction, is not ______, is not _______ and is _____ for the
drainage load of the new plumbing drainage to be installed. - Answers Internally Examined
Sloping
Broken
Obstructed
Sized
Concealment of plumbing and drainage systems - Answers P2503.2
A plumbing or drainage system, or part thereof, shall not be covered, concealed or put into use until it
has been tested, inspected and approved by the building code occicial.
Inspection and Testing: IRC Section - Answers Section 2503
Building Sewer Testing: IRC Chapter - Answers Chapter 25
2503.4
What does DWV stand for? - Answers Drain, Waste, Vent
, DWV water test: Each section shall be filled with water to a point not less than _ ____ above the highest
fitting connection in that section. Water shall be held in the section under test for a period of __
minutes. - Answers 5 feet
15
Finished Plumbing Testing: IRC Chapter - Answers 25
Building Sewer Testing: The building sewer shall be tested by insertion of a test plug at the point of
connection with the public sewer, filling the building sewer with water and pressurizing the sewer to not
less than __ foot of head water. The test pressure shall not decrease during a period of not less than __
Minutes. - Answers 10
15
Finished Plumbing Water Test Procedure: After the plumbing fixtures have been set and their traps filled
with water, their connections shall be tested and proved gas tight or water tight as follows: - Answers
Each fixture shall be filled and then drained. Traps and fixture connections shall be proven water-tight by
visual inspection.
Shower Liner Test: IRC Chapter - Answers Chapter 25
Section 2503.6
Shower liner test procedure - Answers 1. The pipe from the shower drain shall be plugged water tight.
2. The floor and receptor is filled to a depth of 2 inches.
3. Water shall be retained for a test period of 15 minutes with no evidence of leakage.
Water Supply System Testing: IRC Chapter - Answers Chapter 25
Section 2503.7
Water Supply System Testing Procedure: - Answers Upon completion of the water supply system or a
section of it shall be tested and proved tight under a water pressure of not less than the working
pressure of the system.
Drilling and Notching: IRC Chapter - Answers Chapter 26
Section 2603
Protection against physical damage: IRC Chapter - Answers Chapter 26
Section 2603.2.1