D - (answer)eaves over required windows not < _____. minimum over from
the side & rear property lines
山书山有路勤为径,学海无涯苦作舟有路勤为径,
学海无涯苦作舟径,学海无涯苦作舟
A. 300 MM
B. 600 MM
C. 1000MM
D. 750MM
A - (answer)A type of Pre-Design Service wherein the Architect prepares a
technique to minimize the negative effect of simplified operations associated
with many cost-reduction programs. The goal is to achieve an unimpaired
program at minimum cost.
A. Value Management
B. Space Management Studies
C. Design Brief Preparation
D. Building Appraisal
D - (answer)Guarantee workmanship and quality of materials and equipment
for 1 year.
A. Proposal Bond
B. Performance Bond
C. Payment Bond
D. Guarantee Bond
, 2
A - (answer)If a successful examinee was convicted by a lower court of a crime
involving moral turpitude and has appealed the case to a higher court, can
he/she be refused the issuance of a Certificate of Registration?
书山有路勤为书山有路勤为径,学海无涯苦作舟书
山书山有路勤为径,学海无涯苦作舟有路勤为径,
A. Yes, the学海无涯苦作舟径,学海无涯苦作舟
Board has the power to refuse issuance.
B. Maybe, depending on the court's order.
C. No, since the conviction is not yet final and executory.
D. No, since he/she has passed the examination.
A - (answer)For specialized allied services, what is the activity of total planning
that encompasses social, physical and environmental factors?
A. Comprehensive Planning
B. Environmental Planning
C. Physical Planning
D. Comprehensive Architectural Services
B - (answer)Plans, models and perspectives are?
A. Project Requirements
B. Instruments of practice
C. Contract documents
D. Documents for presentation
B - (answer)The Consulting Architect in this area of practice provides the
Owner/Client with means and measures to ensure the proper function and
maintenance of the building/structure and site after final inspection.
, 3
A. Building Testing and Commissioning
B. Facilities Maintenance and Support
书山有路勤为书山有路勤为径,学海无涯苦作舟书
C. Building Environment Certification
山书山有路勤为径,学海无涯苦作舟有路勤为径,
D. Forensic Architecture
学海无涯苦作舟径,学海无涯苦作舟
D - (answer)An architect suggested to the client that a blank wall in one of the
portion of the lobby be provided with a mural painting. The client agreed and
asked the Architect to present a design for the mural painting. The Architect
hired a popular painter to make the concept design. Who will pay for the
services of the mural painter?
A. To be decided by arbitration
B. Already included in the fees of the Architect
C. Architect
D. Client
B
Building permit 5
Fire officials 6
Owner 7
Contractor 4 - (answer)How many sets of plan are to be given/submitted to the
owner?
A. 4
B. 7
C. 5
D. 6
RA 9266 Exam Questions and Answers Latest
Updated 2024/2025 (Graded)
书山有路勤为书山有路勤为径,学海无涯苦作舟书
D - (answer)eaves over required windows not < _____. minimum over from
the side & rear property lines
山书山有路勤为径,学海无涯苦作舟有路勤为径,
学海无涯苦作舟径,学海无涯苦作舟
A. 300 MM
B. 600 MM
C. 1000MM
D. 750MM
A - (answer)A type of Pre-Design Service wherein the Architect prepares a
technique to minimize the negative effect of simplified operations associated
with many cost-reduction programs. The goal is to achieve an unimpaired
program at minimum cost.
A. Value Management
B. Space Management Studies
C. Design Brief Preparation
D. Building Appraisal
D - (answer)Guarantee workmanship and quality of materials and equipment
for 1 year.
A. Proposal Bond
B. Performance Bond
C. Payment Bond
D. Guarantee Bond
, 2
A - (answer)If a successful examinee was convicted by a lower court of a crime
involving moral turpitude and has appealed the case to a higher court, can
he/she be refused the issuance of a Certificate of Registration?
书山有路勤为书山有路勤为径,学海无涯苦作舟书
山书山有路勤为径,学海无涯苦作舟有路勤为径,
A. Yes, the学海无涯苦作舟径,学海无涯苦作舟
Board has the power to refuse issuance.
B. Maybe, depending on the court's order.
C. No, since the conviction is not yet final and executory.
D. No, since he/she has passed the examination.
A - (answer)For specialized allied services, what is the activity of total planning
that encompasses social, physical and environmental factors?
A. Comprehensive Planning
B. Environmental Planning
C. Physical Planning
D. Comprehensive Architectural Services
B - (answer)Plans, models and perspectives are?
A. Project Requirements
B. Instruments of practice
C. Contract documents
D. Documents for presentation
B - (answer)The Consulting Architect in this area of practice provides the
Owner/Client with means and measures to ensure the proper function and
maintenance of the building/structure and site after final inspection.
, 3
A. Building Testing and Commissioning
B. Facilities Maintenance and Support
书山有路勤为书山有路勤为径,学海无涯苦作舟书
C. Building Environment Certification
山书山有路勤为径,学海无涯苦作舟有路勤为径,
D. Forensic Architecture
学海无涯苦作舟径,学海无涯苦作舟
D - (answer)An architect suggested to the client that a blank wall in one of the
portion of the lobby be provided with a mural painting. The client agreed and
asked the Architect to present a design for the mural painting. The Architect
hired a popular painter to make the concept design. Who will pay for the
services of the mural painter?
A. To be decided by arbitration
B. Already included in the fees of the Architect
C. Architect
D. Client
B
Building permit 5
Fire officials 6
Owner 7
Contractor 4 - (answer)How many sets of plan are to be given/submitted to the
owner?
A. 4
B. 7
C. 5
D. 6