CONSTRUCTION EXAM WITH CORRECT
ACTUAL QUESTIONS AND CORRECTLY
WELL DEFINED ANSWERS LATEST 2025
ALREADY GRADED A+
Cross-section views at specified points along the proposed roadway. They will
show the existing ground line and will super-impose the proposed roadway over
the existing. Typical sections provide a cross-section view/picture of what the
roadway will look like. - ANSWERS-Typical section sheets show
This sheet will show in a table the quantities of all the construction pay items
anticipated for the complete construction of the roadway. These quantities are
based on the final design estimate by the designer. These quantities will be used
in creating the schedule of the materials sampling plan. - ANSWERS-Summary of
quantities sheets
A detail is a view of a very specific item of work. It can be a plan view, but most
likely will be a cross-section view. N.T.S. means not to scale. - ANSWERS-Plan
details
,Divide the #4 by 8 to get the diameter.
4/8=0.5" or 1/2" - ANSWERS-What is the diameter of a #4 rebar?
Divide the #6 by 8 to get the diameter.
6/8=0.75" or 3/4" - ANSWERS-What is the diameter of a #6 rebar.
False: profile sheets - ANSWERS-T/F Typical section sheets show elevation views
of the proposed road.
False: plan sheets or key sheet - ANSWERS-T/F The directional arrow is found on
the profile sheet.
Typical section sheets - ANSWERS-The shape of the roads side slopes and ditches
are found on what sheet?
10 - ANSWERS-Flourine has an atomic weight of 19 and an atomic number of 9.
What is the number of neutrons in the atomic nucleus?
65 - ANSWERS-An atom has 30 protons and 35 neutrons in its nucleus. It has 30
electrons in its shells. Its atomic weight would be?
, Granular materials - ANSWERS-Backfill for use around culverts and pipes consists
of
The rate of decay is measured by its - ANSWERS-Half life
The pH number that indicates the greatest acidity is - ANSWERS-1
Approximate mass of 49N weight is - ANSWERS-5KG
The atomic number is the number of protons in an atom - ANSWERS-Atomic
nucleus
Alignment of the pipe - ANSWERS-An inspector looks through one end of a
drainage pipe. He is most likely checking
Larger trench widths mean more backfill material, which increases costs. -
ANSWERS-An important consideration in excavation for drainage is the trench
width. Why is it important to keep the trench width to that which is called for by
the specifications, and not larger?
Obtain a small part of a lot to represent the whole. - ANSWERS-The main purpose
of sampling any material is?
Weight of water/weight of cement - ANSWERS-What is the water cement ratio?