1,800,000 - CORRECT ANSWER: determine the required annualized maintenance cost
assume 3% per year for the building life span or cycle of 38 years and 60 million for new
construction
1%-3% - CORRECT ANSWER: excluding utilities what percentage range of the current
replacement value should be used to properly maintain a facility
100% - CORRECT ANSWER: under the terms of a typical performance bond for a
construction project the bonds are most commonly valued at what contract amount
15 to 60 million - CORRECT ANSWER: if the cost range is between 5 and 20 percent in
the initial stages (build it phase) of an estimated 300 million total cost of ownership
example, what is the range of cost for this phase
15% - CORRECT ANSWER: what is the ideal percentage of staffing desired for a
project and relief crew
20% - CORRECT ANSWER: what is the ideal percentage of staffing desired for a
project and relief crew
3-15 million - CORRECT ANSWER: if the cost range is between 1 and 5 percent in the
final stage (get rid of it phase) of an estimated 300 million total cost of ownership
example what is the range of cost for this phase
300 million - CORRECT ANSWER: using the total cost of ownership model a 60 million
academic building with a 50 year life span or cycle would cost
,35% - CORRECT ANSWER: what is the initial construction cost compared with the total
cost of ownership of a building over its expected life
9-12 - CORRECT ANSWER: according to the operational guidelines for custodial, an
effective managing ratio for custodial employees FTE to supervisor is
A CMMS - CORRECT ANSWER: the most effective work order system is
a comprehensive approach concerning the facility portfolio - CORRECT ANSWER: the
strategic capital development model focuses on
a current campus master plan that is under way - CORRECT ANSWER: the most
significant tool to have in place to support a major capital expansion is
a partial waiver to get around compliance in certain circumstances - CORRECT
ANSWER: while designing significant renovations to existing historic buildings what type
of waiver will allow for an exception to be made
a proposed capital expenditure is not likely to be in conformance - CORRECT
ANSWER: in which situation will an amendment to the campus master plan be
presented
a provision for future flexibility, adaptability, and life cycle considerations - CORRECT
ANSWER: the process for creating a campus master plan should include
a significant cost savings in products - CORRECT ANSWER: for custodial planning, a
pre-measured chemical system is primarily used to accomplish
a strategic planning tool uses the swot analysis. swot is an acronym for strengths,
weaknesses, opportunities, and - CORRECT ANSWER: threats
,a work order system - CORRECT ANSWER: in a facilities professionals role parent child
relationships best apply to
a work order system, cost estimating, and scheduling - CORRECT ANSWER: three
components of a good work management system are
absorption - CORRECT ANSWER: three major types of chiller systems most commonly
used in central power plants today include centrifugal, reciprocating, and
absorption chillers and sterilizers - CORRECT ANSWER: steam is used as an energy
source for
academic strategic plan - CORRECT ANSWER: an effective campus master plan
should incorporate the institutions utility, landscape, and sustainability plan as well as
the
accept the risk - CORRECT ANSWER: a facilities department is currently processing
under 10,000 worth of construction invoices each month. using the risk impact vs
probability model, what level of financial controls should be considered for this activity
Accrual Accounting - CORRECT ANSWER: which type of accounting is the most widely
used due to its ability to measure revenues when the amount is earned and expenses
and other deductions when revenues are used up
actual vs budget - CORRECT ANSWER: for various maintenance spending rates, which
cost control measure needs to be considered
actual vs budget - CORRECT ANSWER: the most important budget comparison
technique to a facilities professional
actual vs budget - CORRECT ANSWER: the most important budget comparison
technique to a facilities professional is
, algae - CORRECT ANSWER: open circulating systems for cooling towers are subject to
problems such as scale, corrosion, slime, and
all costs divided by estimated life span of facility then divided by total gsf - CORRECT
ANSWER: which formula will help to determine the total cost of ownership of a facility
allows priorities to be set with the best information available - CORRECT ANSWER:
what will be the primary benefit for the institution to continue the full process of capital
renewal and replacement
amount or quantity - CORRECT ANSWER: what is one of the five components of space
an academic plan, space plan, utility master plan, and condition assessment -
CORRECT ANSWER: a campus master plan should be based on the following
an effective key control system - CORRECT ANSWER: a top priority in campus security
is
an effective method for labor dispute resolution is - CORRECT ANSWER: mediation
are a potential source of labor and dollar savings over time - CORRECT ANSWER:
irrigation systems have become a mainstay for turf and plant maintenance because they
are managed essentially as self supporting activities - CORRECT ANSWER: the
distinguishing characteristic of enterprise/auxiliary organizations is that they
as part of the needs assessment stage - CORRECT ANSWER: an institutions strategic
capital development model reviews facilities quality under what conditions
assets are increased and liabilities are incurred - CORRECT ANSWER: an institution is
building an extension on a campus building