API 653 defines a "Storage tank engineer" as:
A) A registered professional engineer in structural
steel fabrication
B) Person or organization who is knowledgeable and
experienced in the engineering disciplines
associated with evaluating the integrity and reliability
of aboveground storage tanks
,C) the engineering department of a contractor who
makes repairs to aboveground storage tanks
D) A professional engineer who is also an authorized
API 653 inspector - Answer-B
Similar service is means of estimating corrosion
rates that:
A) Is Seldom used as a means of scheduling internal
inspection intervals
B) Ignores environmental factors in the
determination of corrosion rates
C) May be used in addition to or in lieu of actual
measurement of corrosion rates
,D) Is generally considered as the best methodology
for establishing the inspection intervals - Answer-C
Controlled Deposition welding methods, in lieu of
PWHT, is limited to:
A) P-1 materials
B) P-1 and P-3 Materials only
C) P-1, P3, and P4 materials only
D) P-5A materials - Answer-C
Inspection hold points, for tank reconstruction, shall
be designated by:
A) The authorized inspector
, B) An engineer experienced in storage tank design
C) Agreement between tank owner/user and
reconstruction contractor
D) Agreement between and engineer and the
authorized - Answer-A
All repair and alteration work shall be approved at all
designated hold points and after completion:
A) Need not be approved if approved will delay work
progress
B) By the repair organization of the repairs were
done according to the specified repair and/or
alteration procedures