1. A CM's Role and Responsibilities - Correct Answer-Governed solely by
the Owner/CM Agreement.
2. Basic Forms of CM - Correct Answer-Agency and at-risk. Key
differences exist.
3. Factors Contributing to CM's Initial Use - Correct Answer-Need to
reduce time and cost, increasing project funding costs, changing role of
contractors.
4. First Federal Agency to Use CM - Correct Answer-General Services
Administration.
5. Common Problems in CM Use by Federal Agencies - Correct Answer-
Funding restrictions, claims, change conditions.
, Page |2
6. Formation of CMAA - Correct Answer-Incorporated in 1982 to grow and
develop CM profession.
7. CMAA Construction Management Standards - Correct Answer-Guide to
professional CM services.
8. Goals of CMAA - Correct Answer-Setting standards, expanding
understanding, advocating for CM.
9. Certification and Qualification as a CM - Correct Answer-Certification in
another profession does not automatically qualify as a CM.
10. Certification as a CM - Correct Answer-Does not guarantee 'state of
the art' knowledge and capability.
11. Recruiting and training in business - Correct Answer-False
12. Construction management susceptible to overselling - Correct
Answer-True
, Page |3
13. Failure to provide quality services - Correct Answer-False
14. Contracting for adequate fees - Correct Answer-True
15. Ethics of CM profession focus on client relationships - Correct
Answer-True
16. Reasons for project delivery variations - Correct Answer-D) All of the
above
17. Traditional delivery system phases executed in - Correct Answer-B) A
linear sequence
18. Advantage of traditional delivery approach - Correct Answer-B)
Facility features are fully determined & specified.
19. Design-build and at-risk CM allow fast-track or phased projects -
Correct Answer-True
, Page |4
20. Contractual definition of CM known when - Correct Answer-D) All of
the above
21. In a CM-at-Risk arrangement, once construction begins, the CM has
no implied duties of loyalty and care to the owner. - Correct Answer-True
22. The agency CM does not perform design or actual construction work.
- Correct Answer-True
23. Under the CM-at-Risk delivery method, the owner usually deals with
a hybrid of a construction manager and a general contractor. - Correct
Answer-True
24. Under a CM-at-risk contract, all of the following statements are true: -
Correct Answer-D) All of the above
25. In considering the differences between agency CM and CM-at-Risk,
which statement is NOT true? - Correct Answer-D) In an agency CM
role, the CM directly subcontracts all trade contracts.
26. The agency CM does not maintain a direct contractual relationship
with the trade or prime contractors. - Correct Answer-False