Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

P-99 Low Pressure Boiler COF FDNY Exam Questions And Answers 100% Guaranteed Pass.

Beoordeling
-
Verkocht
1
Pagina's
8
Cijfer
A+
Geüpload op
24-01-2025
Geschreven in
2024/2025

P-99 Low Pressure Boiler COF FDNY Exam Questions And Answers 100% Guaranteed Pass. A fill line in an oil burner system is a line used to: - AnswerFill the storage tank with oil. The aquastat is located - AnswerBelow the water line. All heating, combustion, and cooking equipment shall be installed with adequate clearances from _______ construction. - AnswerCombustible The equipment must be provided with ______ or the building construction shall be _____ _____. - AnswerInsulation. Fire Protected During operation the surface of combustible construction materials will not be raised to a temp higher than _____ degrees F. - Answer170 degrees Equipment shall be so that the means of access for ordinary operation and maintenance will not be _______. - AnswerHazardous Acceptance Tests: Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____ _____ has been issued by the ______. - AnswerInspected and tested. Use permit, commissioner Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney connections. - AnswerOnce a year Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the ________, specifying the _____of each boiler and ______ for inspection. - AnswerAnnual, commissioner, location, arrangement. ©SIRJOEL 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before the system is operated. - AnswerHydrostatically, contractor The piping shall be tested at _____ times the max working pressure applicable to that part of the piping system but at a pressure ____ than the test pressure required for the storage tank. - Answer1/2, less The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than ____ psi. - Answer1 1/2, 25 psi The hydrostatic pressure must be maintained until all ____ and _____ have been visually inspected for ___, but in no case less than _____ hour. - AnswerJoints, connections, leaks, 1/2 hour. A record must be kept of the pressure test showing the name of the _____ and the _____ at which the piping and tank were tested. - AnswerContractor, pressure Gas piping must be tested by the _____ before operation. - AnswerContractor For oil burning systems, ____ ____ giving instructions for the care and operation of the system shall be permanently located in an easily _____ and _____ location near the equipment. - AnswerInstruction Cards, visible, accessible No oil burning equipment shall be operated until an equipment ____ _____ has been issued by the commissioner, the requirements of the ____ ____ control code have been met and until the approval for the storage of ____ ____ has been given by the fire commissioner. - AnswerUse permit, air pollution, fuel oil Every oil burning installation that is not fully automatic or requires preheating shall be operated under the direct supervision of a person holding a ____ ___ ______ issued by the FD. - AnswerCOF Such person must be in the building at ____ ____ while in operation and present in the _____ _____ during startup. - AnswerAll times, boiler room After any repairs to the boiler are made, ______ shall check the repairs and the functioning of all ____ _____ and the positioning of the ______. - AnswerOperators, control devices, valves All heating and combustion equipment that is fired with solid, liquid, or gas fuels, must comply with the requirements of the ____ _____ _____ code. - AnswerAir pollution control Low Temp Equipment have a temp of ____ degrees at the point of leaving the equipment. - Answer600 or less Median Temp Equipment have a temp of between _

Meer zien Lees minder
Instelling
P99 Low Pressure Boiler COF FDNY
Vak
P99 low pressure boiler COF FDNY

Voorbeeld van de inhoud

©SIRJOEL 2024/2025 ALL RIGHTS RESERVED.



P-99 Low Pressure Boiler COF FDNY Exam
Questions And Answers 100% Guaranteed
Pass.



A fill line in an oil burner system is a line used to: - Answer✔Fill the storage tank with oil.

The aquastat is located - Answer✔Below the water line.
All heating, combustion, and cooking equipment shall be installed with adequate clearances
from _______ construction. - Answer✔Combustible
The equipment must be provided with ______ or the building construction shall be _____
_____. - Answer✔Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be raised to a temp
higher than _____ degrees F. - Answer✔170 degrees
Equipment shall be so that the means of access for ordinary operation and maintenance will
not be _______. - Answer✔Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an equipment
____ _____ has been issued by the ______. - Answer✔Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - Answer✔Once a year
Owners Annual Statement: The owner of each boiler shall file an _____ written statement with
the ________, specifying the _____of each boiler and ______ for inspection. - Answer✔Annual,
commissioner, location, arrangement.



1|Page

, ©SIRJOEL 2024/2025 ALL RIGHTS RESERVED.

Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______
before the system is operated. - Answer✔Hydrostatically, contractor
The piping shall be tested at _____ times the max working pressure applicable to that part of
the piping system but at a pressure ____ than the test pressure required for the storage tank. -
Answer✔1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure but in no case
less than ____ psi. - Answer✔1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been visually
inspected for ___, but in no case less than _____ hour. - Answer✔Joints, connections, leaks, 1/2
hour.
A record must be kept of the pressure test showing the name of the _____ and the _____ at
which the piping and tank were tested. - Answer✔Contractor, pressure

Gas piping must be tested by the _____ before operation. - Answer✔Contractor
For oil burning systems, ____ ____ giving instructions for the care and operation of the system
shall be permanently located in an easily _____ and _____ location near the equipment. -
Answer✔Instruction Cards, visible, accessible
No oil burning equipment shall be operated until an equipment ____ _____ has been issued by
the commissioner, the requirements of the ____ ____ control code have been met and until the
approval for the storage of ____ ____ has been given by the fire commissioner. - Answer✔Use
permit, air pollution, fuel oil
Every oil burning installation that is not fully automatic or requires preheating shall be operated
under the direct supervision of a person holding a ____ ___ ______ issued by the FD. -
Answer✔COF
Such person must be in the building at ____ ____ while in operation and present in the _____
_____ during startup. - Answer✔All times, boiler room
After any repairs to the boiler are made, ______ shall check the repairs and the functioning of
all ____ _____ and the positioning of the ______. - Answer✔Operators, control devices, valves
All heating and combustion equipment that is fired with solid, liquid, or gas fuels, must comply
with the requirements of the ____ _____ _____ code. - Answer✔Air pollution control
Low Temp Equipment have a temp of ____ degrees at the point of leaving the equipment. -
Answer✔600 or less
Median Temp Equipment have a temp of between ___ and ___ degrees F at the point of leaving
the equipment under normal conditions. - Answer✔600 and 1000
2|Page

Geschreven voor

Instelling
P99 low pressure boiler COF FDNY
Vak
P99 low pressure boiler COF FDNY

Documentinformatie

Geüpload op
24 januari 2025
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
sirjoel Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
131
Lid sinds
1 jaar
Aantal volgers
13
Documenten
12791
Laatst verkocht
1 week geleden
Sirjoel

Here you will find all documents and package deals offered by sirjoel

3.6

18 beoordelingen

5
4
4
5
3
7
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen