2025)130Q QUESTIONS AND VERIFIED
ANSWERS.
Which of the following zone/sensor types are correct when
programming a SMKT3 - <<<Answers>>>Type 09 For
smoke detection, type 09 for heat detection, type 08 for freeze
detection
What is the correct height at which to install the PIR2 -
<<<Answers>>>At 7.5 feet, 2.1 m
When programming a DW 21, which loop number is used -
<<<Answers>>>1
True or false win programming a sensor into the panel you
can type in the serial number or learn it in by triggering the
device - <<<Answers>>>True
How would you program a GB to when it is mounted on a
master bedroom ceiling - <<<Answers>>>Loop 1 zone type 3
, True or false panic pendants are programmed as an audible
alarm type 07 - <<<Answers>>>False
True or false when installing the take 345 you must ensure
that the transformer is supplying power to the power supply
before connecting the battery - <<<Answers>>>False
True or false you are required to test signals from all
secondary keypad and key fobs even though they are not
detection devices - <<<Answers>>>True
When installing TDW 21 what size b***h did you use to drill
the hole for the sensor - <<<Answers>>>3/4"
True or false the fire fighter may be installed next to a
standalone battery powered smoke detector -
<<<Answers>>>False
True or false when performing a full system test you may
bypass any open doors or windows - <<<Answers>>>False
When programming and SKEY1 you must: -
<<<Answers>>>Always enable the emergency key
True or false when running power to the take-345, polarity
does not matter - <<<Answers>>>False