Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Humber Real Estate - Course 4, Module 2_ Understanding Commercial Construction

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
30-01-2025
Written in
2024/2025

Humber Real Estate - Course 4, Module 2_ Understanding Commercial Construction

Institution
Real Estate Humber
Course
Real estate humber

Content preview

What are the 5 types of sprinkler systems?


Give this one a try later!

, - Wet pipe system
- Dry pipe system
- Pre-action system
- Deluge system
- Combined dry pipe and pre-action system




In larger commercial structures, concrete block walls may be used with ______________________
to more effectively separate units for added structural mass, as well as fire requirements.


Give this one a try later!


Wood framing




What considerations would impact the construction of a building from a regulatory
standpoint?


Give this one a try later!


- Signage
- Greenbelt zones
- Distance separations
- Access and egress points




Flat/sloped roofing is a common ________________ for industrial buildings.


They contain a four-inch rise of slope for every 12 feet of run.

,Give this one a try later!


Waterproof design




What are the 3 types of cranes?


Give this one a try later!


- Bridge (operate on horizontal rails)
- Gantry (portable, operate on wheels, movement in multiple directions is
possible)
- Jib (have an arm attached at an angle to a rotating mast that permits 360
degree swivelling around that mast)




What dictates the size and availability of on-site parking required?


Give this one a try later!


Municipal zoning bylaws




What is a Floor Plate?


Give this one a try later!

, The total square footage of each floor in a multi-level building.




Which type of building material is more commonly used with concrete wall systems and
is subject to more stringent requirements under the Ontario Building Code?


Give this one a try later!


Steel

Note: This is because steels can bend and lose its strength when exposed to
extreme heat. To offset this, steel buildings require additional fire-resistant
materials, which can be costly.




Total allowable off-street parking spaces will typically be established based on the
structure use and _______________________.


Give this one a try later!


Gross floor area

Note: The gross floor area is the sum area of the entire building structure.




Block buildings, often with _________ facing on the front and two sides, are a favourable
choice for buyers, but ___________________ buildings generally dominate industrial structures


Give this one a try later!

Written for

Institution
Real estate humber
Course
Real estate humber

Document information

Uploaded on
January 30, 2025
Number of pages
34
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.50
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
codersimon West Virgina University
Follow You need to be logged in order to follow users or courses
Sold
796
Member since
3 year
Number of followers
478
Documents
6377
Last sold
2 weeks ago
**SOUNDEST LEANING MATERIALS FROM CODERSIMON **

Learning is not attained by chance; it must be sought for with ardor and diligence On this page, you find exams,tests,summaries, notes ,documents, package deals, and flashcards offered by codersimon

3.8

86 reviews

5
43
4
11
3
16
2
4
1
12

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions