Question Bank (K-Scheme)
Name of subject: Estimating, Costing and Valuation
Subject code: 314313 Course: CE
Semester: IV
Unit 2 - Approximate Estimate (6 Marks)
2 Marks
1. Define approximate estimate.
2. State purpose of approximate estimate.
3. State types of approximate estimate.
4. State service units for Hospital building, Theatre, school and auditorium
5. Suggest the method of approximate costing for - (i) Steel bridges (ii) Highway
and Roads (iii) RCC Retaining Wall (iv) Irrigation Canal
4 Marks
1. Prepare approximate estimate of a town hall building having plinth area equal to
1500 sq. m. a) Plinth area rate: 4000 per sq. m b) Water supply and sanitary
installation: 5% of cost of building c) Electric installation: 10% of cost of
building d) Other services: 5% of cost of building e) Contingencies: 3% of
overall cost of building f)Supervision charges: 8% of overall cost of building
2. Describe in brief procedure for preparing approximate estimate for water supply
project.
3. The plint area of proposed building is 390sq.m the known cost of construction
for similar structure is rs 1935000 having plinth area 215sq m. calculate
approximate cost of proposed building.
4. Describe the procedure of preparing approximate estimate for road project.
5. ) Prepare the approximate estimate of residential building having plinth area
900sqm. If the cost of construction of similar existing structure in locality is
Rs.7200000 for plinth area of 1200sqm
6. Prepare approximate estimate for a Government office building having - (i)
Total No. of rooms = 14 (ii) Area of each room = 60 Sq. M and (iii) Area of
other facilities = 150 Sq. M. Similar office building with similar specifications
and having built up area = 1100 Sq. M. was constructed at Rs. 3.55 Crores.
7. The cost of construction of college building is 3 crores for the capacity of 600
students and area of construction about 2500 m2. Prepare approximate estimate
of a new proposed college building for 3500 students with the area 14000 m2.
Use service unit method.
8. Prepare approximate estimate of a factory building from following data. i)
Office premises – R.C.C. framed type. Total area 150 sq.m. built up. ii)
Workshop – 4 bays of size 4 m × 8 m with load bearing walls and A.C. sheet
roof. iii) Plinth area rates. (1) RCC building - Rs. 18,500/- sq. meter (2) Load
bearing building - Rs. 6,500/- sq. meter
Name of subject: Estimating, Costing and Valuation
Subject code: 314313 Course: CE
Semester: IV
Unit 2 - Approximate Estimate (6 Marks)
2 Marks
1. Define approximate estimate.
2. State purpose of approximate estimate.
3. State types of approximate estimate.
4. State service units for Hospital building, Theatre, school and auditorium
5. Suggest the method of approximate costing for - (i) Steel bridges (ii) Highway
and Roads (iii) RCC Retaining Wall (iv) Irrigation Canal
4 Marks
1. Prepare approximate estimate of a town hall building having plinth area equal to
1500 sq. m. a) Plinth area rate: 4000 per sq. m b) Water supply and sanitary
installation: 5% of cost of building c) Electric installation: 10% of cost of
building d) Other services: 5% of cost of building e) Contingencies: 3% of
overall cost of building f)Supervision charges: 8% of overall cost of building
2. Describe in brief procedure for preparing approximate estimate for water supply
project.
3. The plint area of proposed building is 390sq.m the known cost of construction
for similar structure is rs 1935000 having plinth area 215sq m. calculate
approximate cost of proposed building.
4. Describe the procedure of preparing approximate estimate for road project.
5. ) Prepare the approximate estimate of residential building having plinth area
900sqm. If the cost of construction of similar existing structure in locality is
Rs.7200000 for plinth area of 1200sqm
6. Prepare approximate estimate for a Government office building having - (i)
Total No. of rooms = 14 (ii) Area of each room = 60 Sq. M and (iii) Area of
other facilities = 150 Sq. M. Similar office building with similar specifications
and having built up area = 1100 Sq. M. was constructed at Rs. 3.55 Crores.
7. The cost of construction of college building is 3 crores for the capacity of 600
students and area of construction about 2500 m2. Prepare approximate estimate
of a new proposed college building for 3500 students with the area 14000 m2.
Use service unit method.
8. Prepare approximate estimate of a factory building from following data. i)
Office premises – R.C.C. framed type. Total area 150 sq.m. built up. ii)
Workshop – 4 bays of size 4 m × 8 m with load bearing walls and A.C. sheet
roof. iii) Plinth area rates. (1) RCC building - Rs. 18,500/- sq. meter (2) Load
bearing building - Rs. 6,500/- sq. meter