TESTBANK FOR ADVANCED RIGGING TEST QUESTIONS WITH COMPLETE VERIFIED SOLUTIONS 100% correct. The reinforcing on a concrete strain pole is arranged to primarily withstands loads in how many directions? Answer: One direction QUESTION The side of the pole that is to be turned toward the load is called? Answer: The load face QUESTION Overhead signs used in traffic signals are what two types? Answer: Regulatory signs Street name signs QUESTION How are

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

lOMoARcPSD|52156080




TESTBANK FOR ADVANCED RIGGING TEST
QUESTIONS WITH COMPLETE VERIFIED
SOLUTIONS 2024

1) What is meant by the term "two blocking Correct Answer: The load block

contacts the boom point sheaves.



2) lifting 20,000lbs, with a 2-leg bridle sling at a 30 horizontal sling angle,

what is force applied to each leg? Correct Answer: 20,000



3) In multiple crane lifts using an equalizer beam, the weight of the beam

should be considered: Correct Answer: Part of the load weight



4) What is required if there is a deviation in the lift plan? Correct Answer: A

new lift plan



5) On level ground using skids and rollers, what percent of the weight of the

load should yield the required line pull as a general rule of thumb? Correct

Answer: 5%




Downloaded by Frank Waweru ()

, lOMoARcPSD|52156080




6) All of the following are results of unbalanced reeving of the hook block

EXCEPT: Correct Answer: Wear on the hook



7) Before a spreader bar or beams can be used they MUST have been:

Correct Answer: Tested and approved



8) When materials are being hoisted to an upper level, a tag line is used to:

Correct Answer: Help control the load



9) Two cranes are lifting 100 tons . If crane A has 40 % of the load , how

much weight will crane B have on its hook? Correct Answer: 120,000 Ibs.



10) To confirm the rated capacity of a specific sling, consult the

manufacturer's: Correct Answer: Sling tag



11) OSHA regulations require hook replacement if the opening exceeds

what percentage of its original throat opening? Correct Answer: 15%



12) At what percentage of increase in length should a chain sling be

removed from service? Correct Answer: 5%




Downloaded by Frank Waweru ()

, lOMoARcPSD|52156080




13) The methodical process that attempts to identify hazards and devise

plans to overcome or eliminate hazards which may interfere with crane or

rigging is called: Correct Answer: Lift plan



14) What provides additional control of a load being lifted? Correct Answer:

Tag lines



15) When traveling on a rubber tire mobile crane, how should the boom be

positioned? Correct Answer: In line with the direction of travel



16) Before performing pick and carry operations with any mobile crane, it is

important to: Correct Answer: Refer to the manufacturer's capacity chart



17 ) According to ASME B30.5 , a two crane lift is signaled by Correct

Answer: One designated person



18) How much force would be required to move an object up an inclined

plane compared to lifting it vertically? Correct Answer: Less force




Downloaded by Frank Waweru ()

, lOMoARcPSD|52156080




20) All of the following are reasons for stopping personnel lifting operations

EXCEPT Correct Answer: There are no tag lines



22) The point of any object's weight can be assumed to be concentrated at:

Correct Answer: Center of gravity



23) In a spur-gear chain hoist with a two chain system, the endless chain is

used to Correct Answer: Raise and lower the load



24) In an emergency situation, what is the rigger's FIRST priority? Correct

Answer: To prevent injury or loss of life



25) All of the following conditions exert dynamic loading on a crane

EXCEPT: Correct Answer: Static boom angle



26) Proper lead sheave placement as it relates to the hoisting drum

location is: Correct Answer: Proper spooling of wire rope



27) The most important information to consider when planning a lift is:

Correct Answer: weight of the load




Downloaded by Frank Waweru ()

Geschreven voor

Vak

Documentinformatie

Geüpload op
5 februari 2025
Aantal pagina's
72
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.19
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
wawerufrank6

Maak kennis met de verkoper

Seller avatar
wawerufrank6 Appalachian State
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
-
Lid sinds
1 jaar
Aantal volgers
0
Documenten
27
Laatst verkocht
-

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen