GE CCC (Engineering) STUDY GUIDE
LATEST AND ACCURATE SUMMARY.
Geospatial supports General Engineering by
providing Geospatial Information and Services (collection, info extraction,
storage, dissemination, and exploitation of all data referred to a precise
location on the earth’s surface). Geospatial should be included in the
Intelligence Preparation of the Battle Field and Planning Process.
GEO Products
-Geospatial Engineering Products are TERRAIN focused, as opposed to
Geospatial Intelligence, which is focused on ENY Combatant
capabilities/limitations.
Major functions of geospatial engineers
GMAD is the acronym used for functions of GEO Engineers.
Generate
Manage
Analyze
Disseminate
Engineer Reconnaissance
Engineer Recon and CBRNE Recon are NOT a form of Reconnaissance. Tactical
recon is done by CBT Engineers, technical recon is done by GE.
USACE response options
-Forward engineer support team-advance (FEST-A) or recon team (RT) 4-8
PAX
-Advanced echelon (ADVON) team 10-15 PAX
-Contingency Engineer District (CED) 16-24 PAX
Reconnaissance tasks

,-Technical Reconnaissance (GE)
-Infrastructure Survey
-Environment Assessment
-Airfield Assessment
-Route Classification
-Tactical Reconnaissance (CBT)
-Bridge Reconnaissance
-Route Reconnaissance
-Obstacle Reconnaissance
Reconnaissance vs classification
Recon is done by CBT engineers to determine is something is usable or needs
to be improved, classification is done by GE to determine MLC, # of passes,
weight bearing ETC.
Planning Construction Operation
Steps are listed below:
- Gather the tools
- Organize Information
-Analyze needs and requirements
- Develop plans
- Validate those plans
- Distribute work and projects
-Document and revise
Project origin/routing
1. Unit requests on DA 4283
2. Goes DPW for approval
3. Creates list for troop construction requests
4. S3 syncs with DPW for projects
5. Projects are picked and project packets are given; Scope of work, site
plan, and drawings
6. S3 Construction produce construction directive, BOM, Construct Activities
7. Project is assigned to executing company

, Project sustainment
"Engineer equipment and engineer operations require specialized
maintenance and an increased demand of supply to sustain operations -
repair parts, construction material, fuel and POL requirements." -The slides, I
guess.
Construction Contracting
Command Authority does NOT equal Contract Authority. KO is the only person
with the authority to change a contract.
Contracting key players/roles
-Requiring Activity
-Contractor
-Control (Broken into Prime Contract and Subcontract)
-Contracting Officer (with Contracting Officer Representative beneath them.)
Contract ARB
Purchase requirement and commitment PR&C DA3953
Letter of Justification
IGE/IGCE
PWS/SOW
COR Nomination (and certificates)
Draft of Quality Assurance and Surveillance Plan
Other Support Documents
SOW
Statement of Work- Detailed request on what you want from the contractor,
think Host Nation contractors
PWS
Performance Work Statement- More general request on what you want from
the contactor, think KBR.
IG(C)E

Geschreven voor

Instelling
ECCC GE
Vak
ECCC GE

Documentinformatie

Geüpload op
11 februari 2025
Aantal pagina's
18
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Onbekend

Onderwerpen

$16.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
AcademicAllure stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
59
Lid sinds
2 jaar
Aantal volgers
11
Documenten
3079
Laatst verkocht
1 week geleden
MASTERMIND EDUCATIONAL WORLD IDEAS

Visit our store for the best, latest and verified study materials. Our goal is to help you achieve the best by offering Excellent and quality study materials to make your learning easy .Refer your friends also to benefit and don't forget to communicate with the seller for ORDER, PRE ORDER or any Assistant needed. WISHING YOU THE VERY BEST.

4.7

35 beoordelingen

5
29
4
2
3
3
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen