1. The method of computation of Contractor's overhead and profits for Change Order prices, where
both additions and deletions are involved, is found in the:
a) Agreement.
b) Conditions of the Contract.
c) Division 01.
d) Instructions to Bidders.
ANSWER-b) Conditions of the Contract.
2. General Requirements are part of:
a) Supplementary Conditions.
b) Bidding Requirements.
c) Specifications.
d) Summary of Work.
ANSWER-c) Specifications.
3. The three essential considerations in the evaluation of a product are:
a) Requirements, Criteria, and Tests.
b) Costs, Maintenance, and Installation.
c) Life Cycle Cost, Installation Cost, and Maintenance Cost.
d) Case studies, Failures, and Problems.
,ANSWER-a) Requirements, Criteria, and Tests.
4. Whose responsibility is it to furnish the Shop Drawings?
a) The Architect/Engineer
b) The Contractor
c) The Owner
d) The Subcontractor
ANSWER-b) The Contractor
5. The division of the Work among multiple prime Contracts is described in:
a) Instructions to Bidders.
b) Supplementary Conditions.
c) Division 01.
d) Special Conditions.
ANSWER-c) Division 01.
6. During the Project Conception Stage, the A/E may be retained to:
a) Develop outline specifications
b) Describe the character of the mechanical system
c) Prepare renderings
d) Assist in financial feasibility studies
ANSWER-d) Assist in financial feasibility studies
7. What is the main purpose of Master Format?
a) for scheduling, value management, recording of design data and managing costs.
, b) used during the planning stage of a project.
c) to organize the Project Manual, reference keynotes and detailed cost estimates.
d) when there is a standardized need for information to appear upon each page of a project manual.
ANSWER-c) to organize the Project Manual, reference keynotes and detailed cost estimates.
8. The person who becomes secondarily liable for another's debt or performance is called the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee
ANSWER c) Guarantor
9. Integrated projects are distinguished by all of the following characteristics except:
a) Development of virtual project model through input from a collaborative team
b) Trust-based collaboration between project team members
c) Maximized efficiency through design, fabrication, and construction
d) "Just as needed" team involvement to reduce owner's pre-construction expenses
ANSWER-d) "Just as needed" team involvement to reduce owner's pre-construction expenses
10. Outline Specifications are written for
a) only Divisions 02-14 where actual products are discussed
b) Divisions 01-49
c) only Divisions 01-14 (excluding mechanical and electrical)
d) the exclusive use of the A/E
ANSWER-b) Divisions 01-49
EXAM WITH COMPLETE QUESTIONS AND
DETAILED ANSWERS ALREADY GRADED A+
1. The method of computation of Contractor's overhead and profits for Change Order prices, where
both additions and deletions are involved, is found in the:
a) Agreement.
b) Conditions of the Contract.
c) Division 01.
d) Instructions to Bidders.
ANSWER-b) Conditions of the Contract.
2. General Requirements are part of:
a) Supplementary Conditions.
b) Bidding Requirements.
c) Specifications.
d) Summary of Work.
ANSWER-c) Specifications.
3. The three essential considerations in the evaluation of a product are:
a) Requirements, Criteria, and Tests.
b) Costs, Maintenance, and Installation.
c) Life Cycle Cost, Installation Cost, and Maintenance Cost.
d) Case studies, Failures, and Problems.
,ANSWER-a) Requirements, Criteria, and Tests.
4. Whose responsibility is it to furnish the Shop Drawings?
a) The Architect/Engineer
b) The Contractor
c) The Owner
d) The Subcontractor
ANSWER-b) The Contractor
5. The division of the Work among multiple prime Contracts is described in:
a) Instructions to Bidders.
b) Supplementary Conditions.
c) Division 01.
d) Special Conditions.
ANSWER-c) Division 01.
6. During the Project Conception Stage, the A/E may be retained to:
a) Develop outline specifications
b) Describe the character of the mechanical system
c) Prepare renderings
d) Assist in financial feasibility studies
ANSWER-d) Assist in financial feasibility studies
7. What is the main purpose of Master Format?
a) for scheduling, value management, recording of design data and managing costs.
, b) used during the planning stage of a project.
c) to organize the Project Manual, reference keynotes and detailed cost estimates.
d) when there is a standardized need for information to appear upon each page of a project manual.
ANSWER-c) to organize the Project Manual, reference keynotes and detailed cost estimates.
8. The person who becomes secondarily liable for another's debt or performance is called the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee
ANSWER c) Guarantor
9. Integrated projects are distinguished by all of the following characteristics except:
a) Development of virtual project model through input from a collaborative team
b) Trust-based collaboration between project team members
c) Maximized efficiency through design, fabrication, and construction
d) "Just as needed" team involvement to reduce owner's pre-construction expenses
ANSWER-d) "Just as needed" team involvement to reduce owner's pre-construction expenses
10. Outline Specifications are written for
a) only Divisions 02-14 where actual products are discussed
b) Divisions 01-49
c) only Divisions 01-14 (excluding mechanical and electrical)
d) the exclusive use of the A/E
ANSWER-b) Divisions 01-49