CERTIFIED APPLICATOR TRAINING
EXAM QUESTIONS WITH 100%
SOLVED ANSWERS!!
1 of 53
Definition
Must maintain contact with moist soil
Use shelter tubes to bridge over non-cellulose materials.
Move with grain of wood.
Active tubes are darker in color, moist and may contain termites.
Give this one a try later!
, Characteristics of
Treatment of Subterranean Termites
Subterranean Termites
treatment proposals must provide: Western Drywood Termites
Don't know?
2 of 53
Definition
Attack building timbers in poorly ventilated areas, where moisture
collects.
Give this one a try later!
Deathwatch Beetles Carpenter Ants
Bark Beetles Cigarette Beetles
Don't know?
3 of 53
Definition
Down drill adjecent to exterior wall & inject liquid, then foam.
,Give this one a try later!
Back Filled patio application Remove all furniture from the
procedure patio area
Install a new drainage Paint the exterior wall with
system around the house waterproof sealant
Don't know?
4 of 53
Definition
1. Primary slab treatment is official date (start).
2.Incomplete pretreatments tagged as such.
3.Tag electrical box for Final Grade. (end)
4. Horizontal barriers required prior to pour of all slabs under roof.
5.Vertical barriers required in critical areas, stem wall abutting
slabs, tire stops, pipes, patios and porches.
6.OPM/PMD required final grades be done within 12 months of the
pre-treat.
Give this one a try later!
Pretreatment Rules Swarming and Mating
Inspection Procedures Reporting WDI
Don't know?
, 5 of 53
Definition
1. Wood to earth contact
2.Excessive cellulose debris
3. Faulty grade
4. Excessive moisture
5. Inaccessible areas (crawlspace <24")
Give this one a try later!
Characteristics of non-re-infesting Conducive conditions
beetles for termite habitation
Signs of Re-infesting beetle
habitation Excessive Cellulose Debris
Don't know?
6 of 53
Definition
Need basic knowledge of wood destroying pests. Pest problems,
pesticides, methods of application, and equipment.
Give this one a try later!
Inspection Procedures Pretreatment Rules