AIC 301 EXAM: LATEST A+ QUESTIONS AND ANSWERS BREAKDOWN Procurement Process bid scope of work award contract submittals order material and equipment installation and invoicing collect on delivery COD payment of procurement at the time of delivery Fair Labor Standards Act establishes minimum wage, overtime pay, and youth employment standards Illegal Immigration Reform and Immigrant Responsibility Act (IIRAIRA) an act of Congress to strengthen existing immigration laws and ensure an applicant's eligibility to work in the United States. Civil Rights Acts prohibit discrimination in the workplace. Notice of award and letter of intent documents provided by the owner after the bid has been awarded but before a contract is issued. They are generally used to start the administrative process of going to contract while the final terms of the contract are negotiated. Typical activities these documents start are acquiring insurance, obtaining the bonds, and starting the submittals. Notice to proceed a document that is issued by the owner after the contract is signed and is the formal start of the project. The date of the document is the formal start of the project and used to calculate when it is contractually required to be finished. The notice to proceed is also a certification from the owner that the site is clear of encumbrances and ready for the contractor to start their work unimpeded. Stop work order a document typically issued by the owner ordering the contractor to stop all work on the project. Schedule of values typically required at the beginning of the project and provides a breakdown of the cost of work. The schedule of values is most often used for progress payments. Permits documents provided by the municipality having jurisdiction to approve the construction of a project based on the contract documents developed by the designer. Certificate of substantial completion a document that indicates that the owner has accepted the building and that it can be used for its intended purpose. Certificate of occupancy a document issued by the municipality having jurisdiction indicating that the building is safe to occupy, and it formally closes out the permit. Request for information (RFI) formally documents a question or request for clarification by the contractor to the designer. Record of as-built drawings are documents maintained by the contractor that show all of the deviations and changes in installation of the work from how it was shown on the contract documents. Change order the document that formally changes the cost, duration, or scope of the contract agreement. Construction change directive (CCD) a document issued by the owner/designer directing the contractor to proceed with changes to the work without necessarily agreeing to a price. Minor changes a term included with AIA contracts that allows architects, without necessarily having approval of the owner or contractor, to authorize small changes in the work. Architect supplemental instruction (ASI) a document included with AIA contracts and used for minor changes in scope without any changes in schedule or costs. construction claim an unresolved request by the contractor for additional time or money as a result of a condition they believe is outside of the contract terms. substantial completion a specific point in the project when the owner can use the building for its intended purpose. Punch List

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

AIC 301 EXAM: LATEST A+ QUESTIONS AND ANSWERS
BREAKDOWN
Procurement Process

bid scope of work
award
contract
submittals
order material and equipment
installation and invoicing

collect on delivery

COD
payment of procurement at the time of delivery

Fair Labor Standards Act

establishes minimum wage, overtime pay, and youth employment standards

Illegal Immigration Reform and Immigrant Responsibility Act (IIRAIRA)

an act of Congress to strengthen existing immigration laws and ensure an applicant's eligibility to work
in the United States.

Civil Rights Acts

prohibit discrimination in the workplace.

Notice of award and letter of intent

documents provided by the owner after the bid has been awarded but before a contract is issued. They
are generally used to start the administrative process of going to contract while the final terms of the
contract are negotiated. Typical activities these documents start are acquiring insurance, obtaining the
bonds, and starting the submittals.

Notice to proceed

a document that is issued by the owner after the contract is signed and is the formal start of the project.
The date of the document is the formal start of the project and used to calculate when it is contractually
required to be finished. The notice to proceed is also a certification from the owner that the site is clear
of encumbrances and ready for the contractor to start their work unimpeded.

Stop work order

a document typically issued by the owner ordering the contractor to stop all work on the project.

Schedule of values

typically required at the beginning of the project and provides a breakdown of the cost of work. The
schedule of values is most often used for progress payments.

, Permits

documents provided by the municipality having jurisdiction to approve the construction of a project
based on the contract documents developed by the designer.

Certificate of substantial completion

a document that indicates that the owner has accepted the building and that it can be used for its
intended purpose.

Certificate of occupancy

a document issued by the municipality having jurisdiction indicating that the building is safe to occupy,
and it formally closes out the permit.

Request for information (RFI)

formally documents a question or request for clarification by the contractor to the designer.

Record of as-built drawings

are documents maintained by the contractor that show all of the deviations and changes in installation
of the work from how it was shown on the contract documents.

Change order

the document that formally changes the cost, duration, or scope of the contract agreement.

Construction change directive (CCD)

a document issued by the owner/designer directing the contractor to proceed with changes to the work
without necessarily agreeing to a price.

Minor changes

a term included with AIA
contracts that allows architects, without necessarily having approval of the owner or contractor, to
authorize small changes in the work.

Architect supplemental instruction (ASI)

a document included with AIA contracts and used for minor changes in scope without any changes in
schedule or costs.

construction claim

an unresolved request by the contractor for additional time or money as a result of a condition they
believe is outside of the contract terms.

substantial completion

a specific point in the project when the owner can use the building for its intended purpose.

Punch List

Geschreven voor

Vak

Documentinformatie

Geüpload op
22 februari 2025
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$9.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TopGradeSolutions Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
95
Lid sinds
2 jaar
Aantal volgers
9
Documenten
13297
Laatst verkocht
5 dagen geleden
TOPGRADESOLUTIONS

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lees meer Lees minder
4.9

171 beoordelingen

5
159
4
7
3
4
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen