What are the scope of a planning run? - ACCURATE ANSWERS✔✔ -
Regenerative Planning
-Net Change for Total Horizon
What is the purpose of Material Ledger? - ACCURATE ANSWERS✔✔
-the elimination of locking and increase throughput for standard pricing
for material valuation
-improved and flexible valuation methods in multiple currencies and
parallel accounting
What is the output of an MRP run? - ACCURATE ANSWERS✔✔ -
Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items
What is the master data need for Adv. Planning? - ACCURATE
ANSWERS✔✔ - Location
- Product
- Resource
,List the Options for Running MRP? - ACCURATE ANSWERS✔✔ -
Total Planning
- Single Item Planning Multilevel
- Single Item Planning Single Level
- Single Item Planning Interactive
What is the difference between the stock requirements list and the MRP
list? - ACCURATE ANSWERS✔✔ Stock Req - Real Time / Dynamic
MRP List - Static / Frozen
What is the difference between MRP and Consumption Based Planning?
- ACCURATE ANSWERS✔✔ MRP - planned on requirements (future,
current, forecast)
CBP - planning on historical data (historical)
What does a work center control? - ACCURATE ANSWERS✔✔
Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
,Activity Types
What is the result of a completion confirmation? - ACCURATE
ANSWERS✔✔ - Progress of the order / status update
- GR partial or final
- Time Activity Update
- Scrap leftover material
What happens, on the Stock Requirements List, when a planned order is
converted to a production order for the finished product: - ACCURATE
ANSWERS✔✔ - planned order converts to production order
- BOM + routing is copied from planned order to production order
What happens, on the Stock Requirements List, when a planned order is
converted to a production order for the components: - ACCURATE
ANSWERS✔✔ - reservations for dependent components
What is a standard cost estimate used for? - ACCURATE
ANSWERS✔✔ -Determine the sales price
- Update the standard price in material master
- Calculate the planned cost in a production order
What is a work center? - ACCURATE ANSWERS✔✔ - type of time
(days, hours)
, - where
- who
- identifies the resources
- formula calculations
Describe each of the different types of goods movements. - ACCURATE
ANSWERS✔✔ - GR
- GI
- Stock Transfer / Transfer Posting
What is a routing? - ACCURATE ANSWERS✔✔ Sequence of steps to
complete the work
Quantity of time to complete the work
What transactions debit a production order? - ACCURATE
ANSWERS✔✔ GI
Confirmation
External Processing
Overhead
Direct FI Postings
What transactions credit a production order? - ACCURATE
ANSWERS✔✔ GR